Materials lead time reduction in a semiconductor equipment manufacturing plant : process flow planning

Author(s)
Surveski, Ryan
Thumbnail
DownloadFull printable version (8.691Mb)
Other Contributors
Massachusetts Institute of Technology. Department of Mechanical Engineering.
Advisor
Stephen C. Graves.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
Process flow at a semiconductor tool manufacturer was studied with the goal of reducing production order lead time to 8 hours. Current material flow systems were studied and interviews with the involved personnel were conducted. Additionally, data was extracted and analyzed from the company's SAP Extended Warehouse Management database to analyze the past performance of the material flow group. Three areas for improvement were analyzed and recommendations were made regarding each area. First, it is recommended that an additional truck driver is hired and that a final delivery is made after the last warehouse worked stops working. This will reduce the time that parts wait for the truck to pick them up and eliminate any parts that wait overnight. Second, warehouse employees should start work earlier in the morning to complete sales picks; this will allow the rest of the workers to work on production orders in the morning, immediately after they are placed. Third, the tracking scans to put parts into and out of the consolidation areas should be removed. This will allow workers to preform the picking and consolidation steps faster. These recommendations are to be combined with other material flow improvements. It was determined that the goal of 8 hours lead time was unrealistic. However, calculations suggest that lead time will be reduced to 16 hours.
Description
Thesis: M. Eng. in Manufacturing, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2013.
 
Cataloged from PDF version of thesis.
 
Includes bibliographical references (pages 90-92).
 
Date issued
2013
URI
http://hdl.handle.net/1721.1/85785
Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Publisher
Massachusetts Institute of Technology
Keywords
Mechanical Engineering.

Collections
  • Graduate Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.