Show simple item record

dc.contributor.advisorJung-Hoon Chun.en_US
dc.contributor.authorGupta, Snegdhaen_US
dc.contributor.otherMassachusetts Institute of Technology. Department of Mechanical Engineering.en_US
dc.date.accessioned2014-03-19T15:45:49Z
dc.date.available2014-03-19T15:45:49Z
dc.date.copyright2013en_US
dc.date.issued2013en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/85794
dc.descriptionThesis: M. Eng. in Manufacturing, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2013.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (page 132).en_US
dc.description.abstractThis thesis addresses the challenge of improving on-time delivery performance of stators in the high mix valve manufacturing cell at the Milford facility of Waters Corporation with a focus on efficient line design without exceeding the average WIP levels observed in the current system. A detailed study of the current process was done and it was concluded that the poor on-time delivery performance of stators to the assembly department could be attributed to the unacceptably long fabrication lead times-due to the long waiting induced by the fabrication of a high mix of 28 different types of stators- and the lack of an efficient inventory management policy that makes the system susceptible to extreme situations of either stock-outs or inventory explosion. Therefore, a pull-type production system with a responsive fabrication line establishing WIP control and an end of line standardized finished goods inventory management was designed and implemented. An efficient line design was developed by dedicating lines for high volume and high mix parts and by placing in-process buffers to implement a Kanban based pull-type production process that in turn limits the amount of WIP as well. An overall lead time reduction from 21 days to 3 days was achieved through the implementation of this line design and a 40% reduction in WIP levels was observed simultaneously. For standardizing the finished goods inventory management in order to maintain high service levels while eliminating the possibility of WIP explosion, a mixed inventory review policy or the (s,S) policy-that uses a re-order point to trigger production at appropriate times and a base stock level that maintains an upper control limit on the inventory levels- is suggested for implementation. With this policy, a calculated service level of at least 96% is expected even for high demand periods alongside a 50% reduction in average finished goods inventory levels.en_US
dc.description.statementofresponsibilityby Snegdha Gupta.en_US
dc.format.extent132 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleSystem improvements in valve manufacturing cell at Waters Corporationen_US
dc.typeThesisen_US
dc.description.degreeM. Eng. in Manufacturingen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc871687136en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record