dc.contributor.advisor | Stanley B. Gershwin. | en_US |
dc.contributor.author | Yong, Meow Seen, 1977- | en_US |
dc.contributor.other | Massachusetts Institute of Technology. Department of Mechanical Engineering. | en_US |
dc.date.accessioned | 2014-09-09T17:53:22Z | |
dc.date.available | 2014-09-09T17:53:22Z | |
dc.date.copyright | 2001 | en_US |
dc.date.issued | 2001 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.1/89311 | |
dc.description | Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2001. | en_US |
dc.description | Includes bibliographical references (p. 111-112). | en_US |
dc.description.statementofresponsibility | by Meow Seen Yong. | en_US |
dc.format.extent | 112 p. | en_US |
dc.language.iso | eng | en_US |
dc.publisher | Massachusetts Institute of Technology | en_US |
dc.rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. | en_US |
dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | en_US |
dc.subject | Mechanical Engineering. | en_US |
dc.title | Simulation of real-time scheduling policies in multi-product, make-to-order semiconductor fabrication facilities | en_US |
dc.type | Thesis | en_US |
dc.description.degree | S.M. | en_US |
dc.contributor.department | Massachusetts Institute of Technology. Department of Mechanical Engineering | |
dc.identifier.oclc | 48815770 | en_US |