Show simple item record

dc.contributor.advisorMort Webster and Ignacio Pérez-Arriaga.en_US
dc.contributor.authorDonohoo-Vallett, Pearl Elizabethen_US
dc.contributor.otherMassachusetts Institute of Technology. Engineering Systems Division.en_US
dc.date.accessioned2014-09-19T21:43:18Z
dc.date.available2014-09-19T21:43:18Z
dc.date.copyright2014en_US
dc.date.issued2014en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/90160
dc.descriptionThesis: Ph. D. in Technology, Management, and Policy, Massachusetts Institute of Technology, Engineering Systems Division, 2014.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (pages 141-148).en_US
dc.description.abstractThe growth of location-constrained renewable generators and the integration of electricity markets in the United States and Europe are forcing transmission planners to consider the design of interconnection-wide systems. In this context, planners are analyzing major topological changes to the electric transmission system rather than more traditional questions of system reinforcement. Unlike a regional reinforcement problem where a planner may study tens of investments, the wide-area planning problem may consider thousands of investments. Complicating this already challenging problem is uncertainty with respect to future renewable-generation location. Transmission access, however, is imperative for these resources, which are often located distant from electrical demand. This dissertation frames the strategic planning problem and develops dimensionality reduction methods to solve this otherwise computationally intractable problem. This work demonstrates three complementary methods to tractably solve multi-stage stochastic transmission network expansion planning. The first method, the St. Clair Screening Model, limits the number of investments which must be. The model iteratively uses a linear relaxation of the multi-period deterministic transmission expansion planning model to identify transmission corridors and specific investments of interest. The second approach is to develop a reduced-order model of the problem. Creating a reduced order transformation of the problem is difficult due to the binary investment variables, categorical data, and networked nature of the problem. The approach presented here explores two alternative techniques from image recognition, the Method of Moments and Principal Component Analysis, to reduce the dimensionality. Interpolation is then performed in the lower dimensional space. Finally, the third method embeds the reduced order representation within an Approximate Dynamic Programming framework. Approximate Dynamic Programming is a heuristic methodology which combines Monte Carlo methods with a reduced order model of the value function to solve high dimensionality optimization problems. All three approaches are demonstrated on an illustrative interconnection-wide case study problem considering the Western Electric Coordinating Council.en_US
dc.description.statementofresponsibilityby Pearl Elizabeth Donohoo-Vallett.en_US
dc.format.extent159 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectEngineering Systems Division.en_US
dc.titleDesign of wide-area electric transmission networks under uncertainty : methods for dimensionality reductionen_US
dc.typeThesisen_US
dc.description.degreePh. D. in Technology, Management, and Policyen_US
dc.contributor.departmentMassachusetts Institute of Technology. Engineering Systems Division
dc.identifier.oclc890198616en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record