Show simple item record

dc.contributor.advisorBruce Cameron and Georgia Perakis.en_US
dc.contributor.authorGenser, Bradley Philipen_US
dc.contributor.otherLeaders for Global Operations Program.en_US
dc.date.accessioned2014-10-08T15:27:19Z
dc.date.available2014-10-08T15:27:19Z
dc.date.copyright2014en_US
dc.date.issued2014en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/90758
dc.descriptionThesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2014. In conjunction with the Leaders for Global Operations Program at MIT.en_US
dc.descriptionThesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2014. In conjunction with the Leaders for Global Operations Program at MIT.en_US
dc.description10en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (page 111).en_US
dc.description.abstractWe propose a novel method to quantify the cost of activities involved in the picking portion of order fulfillment. We adapt the general method of picking cost quantification to the specific situation of TP&G, a publicly held utility, to build a simulation model which calculates total cost (procurement purchasing costs + material handling costs) across TP&G's Construction Materials Supply Chain (CMSC) . We use the simulation model to demonstrate the effect of case pack quantities and various disputed (within TP&G) material handling policies on supply chain costs. Finally. we move beyond the descriptive results of the simulation model and build optimization models for a case where a single case pack quantity is held in inventory, under conditions of both deterministic and stochastic demand. We show that case pack quantity held in inventory greatly impacts supply chain costs. We also find the novel result that the optimal material picking policy for both deterministic and stochastic demand is a threshold policy whereby orders should be fulfilled with whole case packs up to the highest possible multiple of case pack quantity that does not exceed an ordered quantity. If the remainder of an order to be fulfilled exceeds a certain number of units in a case pack, that remainder should be fulfilled with a whole case pack (overfilled). This threshold can be efficiently calculated for all case pack quantities (optimal or not).en_US
dc.description.statementofresponsibilityby Bradley Philip Genser.en_US
dc.format.extent111 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectSloan School of Management.en_US
dc.subjectMechanical Engineering.en_US
dc.subjectLeaders for Global Operations Program.en_US
dc.titleOptimizing procurement and handling costs in a utilityen_US
dc.typeThesisen_US
dc.description.degreeM.B.A.en_US
dc.description.degreeS.M.en_US
dc.contributor.departmentLeaders for Global Operations Program at MITen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.contributor.departmentSloan School of Management
dc.identifier.oclc891371260en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record