Show simple item record

dc.contributor.advisorDeborah Fitzgerald.en_US
dc.contributor.authorEllison, Karin Denice, 1968-en_US
dc.contributor.otherMassachusetts Institute of Technology. Program in Science, Technology and Society.en_US
dc.date.accessioned2005-08-22T23:15:08Z
dc.date.available2005-08-22T23:15:08Z
dc.date.copyright1999en_US
dc.date.issued2000en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/9169
dc.descriptionThesis (Ph.D.)--Massachusetts Institute of Technology, Program in Science, Technology and Society, February 2000.en_US
dc.descriptionIncludes bibliographical references (p. [327]-349).en_US
dc.description.abstractThis dissertation examines how Americans have transformed the environment through the construction of new technologies and the roles of technical professionals in bringing about these changes. In the twentieth century, federal engineers, working with local Western boosters and their federal superiors, transformed the West's waterscape. Between 1900 and 1970, engineers of the U.S. Bureau of Reclamation--only one of three federal agencies that built dams-constructed over 400. On the Columbia River alone, federal engineers constructed thirteen large dams that turned the nation's fourth largest river into a chain of lakes. Engineers wrought this transformation with multiple purpose dams-a new style of dam building in the twentieth century. This style combined a new way of understanding how dams should be used with new approaches to financing the construction of dams and to designing and siting dam structures. Engineers built dams that developed water resources for multiple uses: navigation, flood control, irrigation, and hydroelectricity production. They financed these dams by allocating the costs among uses and then obtaining funds either through federal grants (for navigation and flood control) or loans (for irrigation and hydroelectricity). Engineers frequently designed these dams as traditional concrete gravity structures and sited them at prime locations on major rivers. This work examines the rise of the multiple purpose style of dam building through the history of Grand Coulee Dam. Located on the Columbia River in Washington State, Grand Coulee Dam is one in a group of large dams planned in the 1920s and built in the 1930s during whose design and construction federal engineers worked out this new style of building. It shows that engineers came to prefer this style because it fulfilled conservationists' hopes for "comprehensive planning" of water resources and it eliminated financial problems with federal irrigation activities. Engineers alone did not launch this building program: local constituencies favored development and Franklin Roosevelt's new administration supported relief projects, conservation programs, and government involvement in the electrical industry. Working together, these three groups built a political coalition for multiple purpose dams that successfully underpinned expanded building.en_US
dc.description.statementofresponsibilityby Karin Denice Ellison.en_US
dc.format.extent349 p.en_US
dc.format.extent33680982 bytes
dc.format.extent33680739 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectProgram in Science, Technology and Society.en_US
dc.titleThe making of a multiple purpose dam : engineering culture, the U.S. Bureau of Reclamation, and Grand Coulee Dam, 1917-1942en_US
dc.typeThesisen_US
dc.description.degreePh.D.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Program in Science, Technology and Society
dc.identifier.oclc45382792en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record