Search
Now showing items 1-3 of 3
NEC FUTURE Preliminary Alternatives Report: Public Comment
(Massachusetts Institute of Technology. Engineering Systems Division, 2013-06)
The United States Department of Transportation's Federal Railroad Administration (FRA) is currently in the early stages of a planning process to define a 30-year passenger rail investment plan for the Northeast Corridor ...
Analysis of High-Speed Rail Implementation Alternatives in the Northeast Corridor: the Role of Institutional and Technological Flexibility
(Massachusetts Institute of Technology. Engineering Systems Division, 2012-07)
In this paper, an engineering systems framework using the CLIOS Process, scenario analysis, and flexibility analysis is used to study the implementation of a high-speed rail corridor in the Northeast Corridor of the United ...
NEC FUTURE Tier I Scoping Process: Public Comment
(Massachusetts Institute of Technology. Engineering Systems Division, 2012-10)
Utilizing its special expertise, the Regional Transportation Planning and High Speed Rail Research Group at the Massachusetts Institute of Technology (MIT) sought to provide input via public comment to the NEC FUTURE Tier ...