Show simple item record

dc.contributor.advisorIgnacio J. Pérez Arriaga.en_US
dc.contributor.authorLeung, Tommy (Tommy Chun Ting)en_US
dc.contributor.otherMassachusetts Institute of Technology. Engineering Systems Division.en_US
dc.date.accessioned2015-09-17T17:41:46Z
dc.date.available2015-09-17T17:41:46Z
dc.date.copyright2015en_US
dc.date.issued2015en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/98547
dc.descriptionThesis: Ph. D., Massachusetts Institute of Technology, Engineering Systems Division, 2015.en_US
dc.descriptionThis electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.en_US
dc.descriptionCataloged from student-submitted PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (pages 235-240).en_US
dc.description.abstractScarce pipeline capacity in regions that rely on natural gas technologies for electricity generation has created volatile prices and reliability concerns. Gas-fired generation firms uniquely operate as large consumers in the gas market and large producers in the electricity market. To explore the effects of this coupling, this dissertation investigates decisions for firms that own gas-fired power plants by proposing a mixed-integer linear programming model that explicitly represents multi-year pipeline capacity commit- ments and service agreements, annual forward capacity offers, annual maintenance schedules, and daily fuel purchases and electricity generation. This dissertation's primary contributions consist of a detailed representation of a gas-fired power-plant owner's planning problem; a hierarchical application of a state-based dimensionality reduction technique to solve the hourly unit commitment problem over different tem- poral scales; a technique to evaluate a firm's forward capacity market offer, including a probabilistic approach to evaluate the risk of forced outages; a case study of New England's gas-electricity system; and an exploration of the applicability of forward capacity markets to reliability problems for other basic goods.en_US
dc.description.statementofresponsibilityby Tommy Leung.en_US
dc.format.extent240 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectEngineering Systems Division.en_US
dc.titleCoupled natural gas and electric power systemsen_US
dc.typeThesisen_US
dc.description.degreePh. D.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Engineering Systems Division
dc.identifier.oclc920673515en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record