dc.contributor.advisor | Duane S. Boning and Lawrence M. Wein. | en_US |
dc.contributor.author | Cooper, Todd (Todd Christopher), 1969- | en_US |
dc.date.accessioned | 2005-08-19T16:36:15Z | |
dc.date.available | 2005-08-19T16:36:15Z | |
dc.date.copyright | 1998 | en_US |
dc.date.issued | 1998 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.1/9885 | |
dc.description | Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (S.M.)--Massachusetts Institute of Technology, Sloan School of Management, 1998. | en_US |
dc.description | Includes bibliographical references (p. 105-106). | en_US |
dc.description.statementofresponsibility | by Todd Cooper. | en_US |
dc.format.extent | 106 p. | en_US |
dc.format.extent | 7143472 bytes | |
dc.format.extent | 7143232 bytes | |
dc.format.mimetype | application/pdf | |
dc.format.mimetype | application/pdf | |
dc.language.iso | eng | en_US |
dc.publisher | Massachusetts Institute of Technology | en_US |
dc.rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. | en_US |
dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | |
dc.subject | Mechanical Engineering | en_US |
dc.subject | Sloan School of Management | en_US |
dc.title | Methodology and justification for building operational consistency in a high volume manufacturing facility | en_US |
dc.type | Thesis | en_US |
dc.description.degree | S.M. | en_US |
dc.contributor.department | Sloan School of Management | en_US |
dc.contributor.department | Massachusetts Institute of Technology. Department of Mechanical Engineering | |
dc.identifier.oclc | 41672898 | en_US |