Show simple item record

dc.contributor.advisorPierre Ghisbain and Jerome J. Connor.en_US
dc.contributor.authorBeacham, Oliver (Oliver Edward)en_US
dc.contributor.otherMassachusetts Institute of Technology. Department of Civil and Environmental Engineering.en_US
dc.date.accessioned2015-10-30T18:57:44Z
dc.date.available2015-10-30T18:57:44Z
dc.date.copyright2015en_US
dc.date.issued2015en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/99583
dc.descriptionThesis: M. Eng., Massachusetts Institute of Technology, Department of Civil and Environmental Engineering, 2015.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (pages 43-45).en_US
dc.description.abstractThe design of the London Olympic Stadium for the 2012 Summer Olympic Games represented a shift in traditional stadium design for major sport events on the scale of the Olympics or World Cup. Emphasising design with a focus towards post-Olympics usage, the London Olympic Stadium through features like a demountable second seating tier, reclaimed steel elements, and structurally isolated fagade, set a strong precedent for flexible Olympics stadium construction. The goal of this thesis is to quantitatively explore options to push the boundaries of flexible stadium design, easing the renovation process required to transition stadiums from Olympics to post-Olympics usage. Through case study design examples, this thesis explores the effect bolted rather than welded connections can have on the design of stadium grandstands. Evaluated for both strength and serviceability, this thesis applies work demonstrating the pros and cons of bolted connections in traditional braced frame structures to stadium grandstands. Finally, this thesis explores the opportunity events like the Olympics provide to perform a probabilistic performance based design on an elliptical roof truss system. Given current building codes specify loads intended for use in the design of permanent structures, this thesis breaks down building code methodology in an attempt to determine loads more appropriate for use in the design of buildings with intended life spans on the order of an Olympic cycle (four years). Looking specifically at a stadium structural system typically controlled by wind and snow loads, this thesis attempts to quantify the material savings possible when designing a structure using performance rather than code based design.en_US
dc.description.statementofresponsibilityby Oliver Beacham.en_US
dc.format.extent58 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectCivil and Environmental Engineering.en_US
dc.titleFlexible stadium design in the context of Olympics and Post-Olympics usageen_US
dc.typeThesisen_US
dc.description.degreeM. Eng.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil and Environmental Engineering
dc.identifier.oclc925473664en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record