<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T17:31:49Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/100107" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/100107</identifier><datestamp>2022-01-28T15:42:44Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Thomas Roemer and Daniel Whitney.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Mangan, Esther Hu</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Global Operations Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2015-12-03T20:53:51Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2015-12-03T20:53:51Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2015</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2015</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/100107</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">929462532</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2015. In conjunction with the Leaders for Global Operations Program at MIT.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2015. In conjunction with the Leaders for Global Operations Program at MIT.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 63-64).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">The Boeing 777 has seen an increased the rate of production from one plane every 7 days to one plane every 2.5 days. Wing production has relied on a sizeable work force and the use of overtime to meet this demand. The primary objective is to improve build efficiency by reducing variability in the production system. The impact of eleven variables was determined using a stepwise regression to predict for total labor hours across 250 airplanes. Three variables - travelers, defects, and quality assurance response time - accounted for almost 50% of the variability in labor hours. Other variations included engineering changes and rate breaks. Moving forward, the Wing Majors shop will redirect resources to control travelers, improve quality, and minimize quality assurance delays.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Esther Hu Mangan.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">64 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Process and system variation impacts on 777 wings manufacturing</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="cdd5b4a9-1d94-4318-bd98-51e5fee5b5be">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Process and system variation impacts on 777 wings manufacturing&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2015&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Mangan, Esther Hu&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Leaders for Global Operations Program.&lt;/Keyword>
   	&lt;Abstract>The Boeing 777 has seen an increased the rate of production from one plane every 7 days to one plane every 2.5 days. Wing production has relied on a sizeable work force and the use of overtime to meet this demand. The primary objective is to improve build efficiency by reducing variability in the production system. The impact of eleven variables was determined using a stepwise regression to predict for total labor hours across 250 airplanes. Three variables - travelers, defects, and quality assurance response time - accounted for almost 50% of the variability in labor hours. Other variations included engineering changes and rate breaks. Moving forward, the Wing Majors shop will redirect resources to control travelers, improve quality, and minimize quality assurance delays.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>