<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T21:38:43Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/107027" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/107027</identifier><datestamp>2026-06-06T00:56:35Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Stanley Gershwin.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Ismail, Elyud</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Department of Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2017-02-22T15:59:35Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2017-02-22T15:59:35Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2016</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2016</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/107027</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">971200019</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: M. Eng. in Advanced Manufacturing and Design, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2016.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">This electronic version was submitted by the student author.  The certified thesis is available in the Institute Archives and Special Collections.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from student-submitted PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 95-96).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">This thesis addresses the improvement of first pass yield on the assembly floor of Varian Semiconductor Equipment and Associates (Varian) - a low volume complex semiconductor capital equipment manufacturing facility. First pass yield refers to the proportion of fully built modules that pass testing without the need for additional rework. The first pass yield (FPY) project began in 2011 and showed steady improvement for its first three years. But over the following two years, the primary yield metric has stayed level. The goal of the work presented here is to analyze the reasons for the leveling and propose novel ways of improving the metric once more. Two major quality improvement recommendations are presented in this thesis. The first is a new way of categorizing error reports that will lead to targeted corrective action to reduce the recurrence of pre-identified failure modes. A multi-step methodology is presented on how to determine an efficient corrective action, along with a case study based on data acquired from Varian. The second quality improvement recommendation involves reducing the number of part and sub-assembly shortages on the assembly floor that were shown to be correlated with poor first pass yield. A new management system for a subset of the total inventory at Varian is presented, along with a discussion on how to execute the recommendation.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Elyud Ismail.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.Eng. in Advanced Manufacturing and Design</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">96 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Quality improvement at a semiconductor equipment manufacturing facility through error re-categorization and proper inventory management</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="f6fae4fe-64b5-4ff6-bf04-73e6a9344d32">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Quality improvement at a semiconductor equipment manufacturing facility through error re-categorization and proper inventory management&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2016&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Ismail, Elyud&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
   	&lt;Abstract>This thesis addresses the improvement of first pass yield on the assembly floor of Varian Semiconductor Equipment and Associates (Varian) - a low volume complex semiconductor capital equipment manufacturing facility. First pass yield refers to the proportion of fully built modules that pass testing without the need for additional rework. The first pass yield (FPY) project began in 2011 and showed steady improvement for its first three years. But over the following two years, the primary yield metric has stayed level. The goal of the work presented here is to analyze the reasons for the leveling and propose novel ways of improving the metric once more. Two major quality improvement recommendations are presented in this thesis. The first is a new way of categorizing error reports that will lead to targeted corrective action to reduce the recurrence of pre-identified failure modes. A multi-step methodology is presented on how to determine an efficient corrective action, along with a case study based on data acquired from Varian. The second quality improvement recommendation involves reducing the number of part and sub-assembly shortages on the assembly floor that were shown to be correlated with poor first pass yield. A new management system for a subset of the total inventory at Varian is presented, along with a discussion on how to execute the recommendation.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>