<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T09:42:46Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/107517" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/107517</identifier><datestamp>2026-06-06T01:03:24Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Jarrod Goentzel.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Kamareddine, Karim</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Yao, Yihong</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Engineering Systems Division.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Supply Chain Management Program</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2017-03-20T19:38:01Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2017-03-20T19:38:01Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2016</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2016</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/107517</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">962735989</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: M. Eng. in Logistics, Massachusetts Institute of Technology, Supply Chain Management Program, 2016.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 46-47).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Large pharmaceutical companies struggle to find innovative ways to reduce work-in-process inventory in their production facilities. In our research, we focus on the tradeoff between inventory and production capacity through investing in new facilities and equipment. This tradeoff will depend on the company's objectives and what it is willing to give up in return for reducing inventory. We found that increasing capacity to reduce work-in-process inventory by investing in new facilities is not always the most favorable approach in terms of net present value. However, for flexibility or lead-time improvements, it may make sense to proceed with the investment. We developed multiple scenarios considering the company's future plans to reduce inventory or grow. These scenarios provide insights into the factors that improve the attractiveness of the investments and those that do not. Our financial analysis along with the guidelines and procedures that we have developed help the sponsor company most effectively reach its goal to reduce its work in process inventory.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Karim Kamareddine and Yihong Yao.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.Eng. in Logistics</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">47 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">MIT theses may be protected by copyright.  Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Supply Chain Management Program.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Engineering Systems Division.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Analyzing tradeoffs between working capital and production capacity for multi-stage manufacturing processes</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="a496f0e1-3209-42bd-9d14-4b1fadc325f6">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Analyzing tradeoffs between working capital and production capacity for multi-stage manufacturing processes&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2016&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Kamareddine, Karim&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
      	&lt;Author>
        	&lt;DisplayName>Yao, Yihong&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Supply Chain Management Program.&lt;/Keyword>
    &lt;Keyword>Engineering Systems Division.&lt;/Keyword>
   	&lt;Abstract>Large pharmaceutical companies struggle to find innovative ways to reduce work-in-process inventory in their production facilities. In our research, we focus on the tradeoff between inventory and production capacity through investing in new facilities and equipment. This tradeoff will depend on the company&amp;apos;s objectives and what it is willing to give up in return for reducing inventory. We found that increasing capacity to reduce work-in-process inventory by investing in new facilities is not always the most favorable approach in terms of net present value. However, for flexibility or lead-time improvements, it may make sense to proceed with the investment. We developed multiple scenarios considering the company&amp;apos;s future plans to reduce inventory or grow. These scenarios provide insights into the factors that improve the attractiveness of the investments and those that do not. Our financial analysis along with the guidelines and procedures that we have developed help the sponsor company most effectively reach its goal to reduce its work in process inventory.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>