<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T08:02:52Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/111477" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/111477</identifier><datestamp>2022-01-27T21:44:22Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Kamal Youcef-Toumi and Scott Keating.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Caetano, Sean Michael</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Global Operations Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2017-09-15T15:35:54Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2017-09-15T15:35:54Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2017</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2017</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/111477</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">1003322147</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, in conjunction with the Leaders for Global Operations Program at MIT, 2017.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, in conjunction with the Leaders for Global Operations Program at MIT, 2017.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 87-88).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">As aerospace Original Equipment Manufacturer's (OEM's) order backlogs soar to between six to ten years and growing, the community sees automation as vital to increasing throughput. Yet the community seems divided on the quantifiable financial benefits. While automation in aerospace assembly dates back to 1937, there is little substantive research on quantifying its business case. This thesis develops a financial model that predicts the benefit of introducing automation into an OEM's manual assembly line. The hypothesis of this project is that there is, in fact, a quantifiable benefit to implementing assembly automation into a current manual assembly process. Based on an initial automation capital investment, the financial model calculates the Net Present Value (NPV) of an aerospace automation project given various OEM production inputs such as: the annual production schedule, learning curve metrics, labor hour savings through automation, rework, health &amp; safety metrics, and automation operating and downtime costs. A current program was used as a case study against the financial model. One significant finding is the effect production learning has on the labor hours saved from automation introduced in this thesis as the 'Efficiency Factor'. Based on the OEM's conservative production data and an initial automation investment of $12M the NPV for the project is about $16M for the firm order (600 ship sets) and about $27M for the entire program (2000 ship sets).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Sean Michael Caetano.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">121 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Quantifying the business case for aerospace assembly automation</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="1d2707de-ca15-4e27-bba5-5178ad4def67">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Quantifying the business case for aerospace assembly automation&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2017&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Caetano, Sean Michael&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
    &lt;Keyword>Leaders for Global Operations Program.&lt;/Keyword>
   	&lt;Abstract>As aerospace Original Equipment Manufacturer&amp;apos;s (OEM&amp;apos;s) order backlogs soar to between six to ten years and growing, the community sees automation as vital to increasing throughput. Yet the community seems divided on the quantifiable financial benefits. While automation in aerospace assembly dates back to 1937, there is little substantive research on quantifying its business case. This thesis develops a financial model that predicts the benefit of introducing automation into an OEM&amp;apos;s manual assembly line. The hypothesis of this project is that there is, in fact, a quantifiable benefit to implementing assembly automation into a current manual assembly process. Based on an initial automation capital investment, the financial model calculates the Net Present Value (NPV) of an aerospace automation project given various OEM production inputs such as: the annual production schedule, learning curve metrics, labor hour savings through automation, rework, health &amp;amp; safety metrics, and automation operating and downtime costs. A current program was used as a case study against the financial model. One significant finding is the effect production learning has on the labor hours saved from automation introduced in this thesis as the &amp;apos;Efficiency Factor&amp;apos;. Based on the OEM&amp;apos;s conservative production data and an initial automation investment of $12M the NPV for the project is about $16M for the firm order (600 ship sets) and about $27M for the entire program (2000 ship sets).&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>