<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-22T00:54:41Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/111535" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/111535</identifier><datestamp>2022-01-27T21:54:26Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">David Simchi-Levi and Roy Welsch.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Myers, Julius (Julius Scott)</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Global Operations Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Engineering Systems Division</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Institute for Data, Systems, and Society</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2017-09-15T15:38:28Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2017-09-15T15:38:28Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2017</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2017</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/111535</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">1003324609</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, in conjunction with the Leaders for Global Operations Program at MIT, 2017.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: S.M. in Engineering Systems, Massachusetts Institute of Technology, School of Engineering, Institute for Data, Systems, and Society, in conjunction with the Leaders for Global Operations Program at MIT, 2017.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 60-61).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Aircraft Company X (AX) manufactures and assembles an immense variety of parts utilized as drive systems and rotor components across its multiple aircraft. The company's value proposition is maintaining the ability to build and service all legacy parts and as a result there is a great deal of variety found in its manufacturing processes. This variety stems from upgrades to manufacturing technology, improvements in material science, design variations, and individual part engineering modifications. In order to be responsive to fluctuating demand while minimizing costs, AX must broadly implement postponement into numerous applications as a way to extract the most value from its resources. This thesis uses multiple applications of postponement within AX to establish a methodology that can be used across various materials, both metallic and non-metallic. This methodology guided implementation of postponement through material physical form consolidation, material substitutions, and even provided insight into which manufacturing technique given a particular material form is optimal. The benefits are numerous to include a roughly 30% inventory reduction, improved buying power resulting in cost savings of over 10%, a reduction of material shortages by over 40%, and shorter lead times for finished goods. Extensions of these applications include aligning AX's supply chain with its suppliers utilizing identified tolerances and adding layers of postponement beyond raw material inputs.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Julius Myers.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M. in Engineering Systems</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">61 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Institute for Data, Systems, and Society.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Engineering Systems Division.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Implementing postponement into low-volume/high-variability manufacturing</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="33385896-fc9c-4b51-81d5-7874dac3bc3f">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Implementing postponement into low-volume/high-variability manufacturing&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2017&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Myers, Julius (Julius Scott)&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword&gt;Institute for Data, Systems, and Society.&lt;/Keyword>
    &lt;Keyword>Engineering Systems Division.&lt;/Keyword>
    &lt;Keyword>Leaders for Global Operations Program.&lt;/Keyword>
   	&lt;Abstract>Aircraft Company X (AX) manufactures and assembles an immense variety of parts utilized as drive systems and rotor components across its multiple aircraft. The company&amp;apos;s value proposition is maintaining the ability to build and service all legacy parts and as a result there is a great deal of variety found in its manufacturing processes. This variety stems from upgrades to manufacturing technology, improvements in material science, design variations, and individual part engineering modifications. In order to be responsive to fluctuating demand while minimizing costs, AX must broadly implement postponement into numerous applications as a way to extract the most value from its resources. This thesis uses multiple applications of postponement within AX to establish a methodology that can be used across various materials, both metallic and non-metallic. This methodology guided implementation of postponement through material physical form consolidation, material substitutions, and even provided insight into which manufacturing technique given a particular material form is optimal. The benefits are numerous to include a roughly 30% inventory reduction, improved buying power resulting in cost savings of over 10%, a reduction of material shortages by over 40%, and shorter lead times for finished goods. Extensions of these applications include aligning AX&amp;apos;s supply chain with its suppliers utilizing identified tolerances and adding layers of postponement beyond raw material inputs.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>