<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T00:14:48Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/122570" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/122570</identifier><datestamp>2021-07-05T14:03:20Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Warren Seering and Nikos Trichakis.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Lorou, Bi Zan Valery.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Department of Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Global Operations Program</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2019-10-11T22:24:03Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2019-10-11T22:24:03Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2019</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2019</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2019</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://hdl.handle.net/1721.1/122570</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">1119387815</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2019, In conjunction with the Leaders for Global Operations Program at MIT</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2019, In conjunction with the Leaders for Global Operations Program at MIT</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 56-57).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">This thesis proposes a supply chain model to improve the lead time for Caterpillar Medium Wheel Loaders in the North America market. The Medium Wheel Loaders division is undergoing many commercial value chain challenges: long lead time to dealers, high demand variability and high degree of configuration complexity. The long lead time may cause Caterpillar and its dealership network to build inventory, leading to high holding costs and inventory management issues. In addition, its customers may turn to competitors to meet their demand causing Caterpillar to lose sales. This project analyses structurally significant features needed to build the core machines at the factory and the parts required for the late stage differentiation at the distribution centers. In addition, it proposes the supply chains models using core configuration and delayed product differentiation concept and optimized inventory in the chain. Finally, the project determines whether the new supply chain brings value not only to Caterpillar but also to the dealers. The project focused on the 950GC machines sold on the North America market. A preliminary study shows that from a pool of a few hundred sold in North America, over hundred different configurations were used, for an average of less than 3 machines sold per configuration. A further analysis of the machines configurations demonstrates that following the core strategy, the machines configurations could be reduced from a few hundred to 8 core configurations. Our models indicate that Caterpillar experiences an increase of inventory while the dealers see their inventory goes down. As a result, Caterpillar incurs more inventory cost with the core strategy while the dealers see their profit increases. But with a better service level and shorter lead time, Caterpillar may increase its market shares.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Bi Zan Valery Lorou.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="collection" lang="en_US">M.B.A. Massachusetts Institute of Technology, Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="collection" lang="en_US">S.M. Massachusetts Institute of Technology, Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">57 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Improve the lead time for the medium wheel loader using core configuration and delayed product differentiation</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="imported" lang="en_US">2019-10-11T22:24:02Z</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="degree" lang="en_US">Master</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="department" lang="en_US">Sloan</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="department" lang="en_US">MechE</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="e1aec787-ba39-4a4f-a8bb-d33ed9c82a03">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Improve the lead time for the medium wheel loader using core configuration and delayed product differentiation&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2019&lt;/PublicationDate>
   	&lt;PublicationDate>2019&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Lorou, Bi Zan Valery.&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
    &lt;Keyword>Leaders for Global Operations Program.&lt;/Keyword>
   	&lt;Abstract>This thesis proposes a supply chain model to improve the lead time for Caterpillar Medium Wheel Loaders in the North America market. The Medium Wheel Loaders division is undergoing many commercial value chain challenges: long lead time to dealers, high demand variability and high degree of configuration complexity. The long lead time may cause Caterpillar and its dealership network to build inventory, leading to high holding costs and inventory management issues. In addition, its customers may turn to competitors to meet their demand causing Caterpillar to lose sales. This project analyses structurally significant features needed to build the core machines at the factory and the parts required for the late stage differentiation at the distribution centers. In addition, it proposes the supply chains models using core configuration and delayed product differentiation concept and optimized inventory in the chain. Finally, the project determines whether the new supply chain brings value not only to Caterpillar but also to the dealers. The project focused on the 950GC machines sold on the North America market. A preliminary study shows that from a pool of a few hundred sold in North America, over hundred different configurations were used, for an average of less than 3 machines sold per configuration. A further analysis of the machines configurations demonstrates that following the core strategy, the machines configurations could be reduced from a few hundred to 8 core configurations. Our models indicate that Caterpillar experiences an increase of inventory while the dealers see their inventory goes down. As a result, Caterpillar incurs more inventory cost with the core strategy while the dealers see their profit increases. But with a better service level and shorter lead time, Caterpillar may increase its market shares.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>