<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T04:58:43Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/126897" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/126897</identifier><datestamp>2021-07-05T14:03:20Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Daniel Whitney, Arnold Barnett and Kamal Youcef-Toumi.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Diallo, Fatima(Fatima Zahraye)</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Department of Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Global Operations Program</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2020-09-03T15:51:09Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2020-09-03T15:51:09Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2020</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2020</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://hdl.handle.net/1721.1/126897</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">1191622832</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, in conjunction with the Leaders for Global Operations Program at MIT, May, 2020</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, in conjunction with the Leaders for Global Operations Program at MIT, May, 2020</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from the official PDF of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 63-64).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">As part of its effort to introduce new technology and to improve the manufacturing system for the 777X production line, Boeing has made a significant capital investment in the Composite Wing Center (CWC). The new facility uses highly automated equipment and processes to support the production of components for the 777X. Since many of the automated machines are unique to the Boeing production system, opportunities exist to model and simulate specific machine systems to ensure that work is being performed as efficiently as possible. To date, most of the factory's process equipment has been installed and is operational, providing a production rate of X parts per month. To meet demand, operations will be gradually ramping up to meet the 777X production targets. The ramp-up to the target production rates will be done by a combination of additional equipment installation and process improvement projects. This research study involves the use of Discrete event simulation to provide insight into current cell capability and to identify process bottlenecks. Moreover, the simulation model incorporates process variability, the sequence of process steps within the cell, equipment downtime data, and resource constraints. The resulting simulation model was verified by comparing it to actual system performance. The model analysis and improvement recommendations show significant improvement over the current process in terms of cycle time reduction and production rates increase. In the future, the developed model will be updated regularly and will be used as a tool to monitor system throughput and to evaluate the impact of process changes to the overall system. In addition, the developed framework will be used to help other plants in a similar situation.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Fatima Diallo.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="collection" lang="en_US">M.B.A. Massachusetts Institute of Technology, Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="collection" lang="en_US">S.M. Massachusetts Institute of Technology, Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">64 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Using discrete-event simulation to increase system capacity : a case study of an assembly plant</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="imported" lang="en_US">2020-09-03T15:51:05Z</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="degree" lang="en_US">Master</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="department" lang="en_US">Sloan</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="department" lang="en_US">MechE</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="0b6ce982-6c5f-489f-ba2e-d4d22cd9f9d4">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Using discrete-event simulation to increase system capacity : a case study of an assembly plant&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2020&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Diallo, Fatima(Fatima Zahraye)&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
    &lt;Keyword>Leaders for Global Operations Program.&lt;/Keyword>
   	&lt;Abstract>As part of its effort to introduce new technology and to improve the manufacturing system for the 777X production line, Boeing has made a significant capital investment in the Composite Wing Center (CWC). The new facility uses highly automated equipment and processes to support the production of components for the 777X. Since many of the automated machines are unique to the Boeing production system, opportunities exist to model and simulate specific machine systems to ensure that work is being performed as efficiently as possible. To date, most of the factory&amp;apos;s process equipment has been installed and is operational, providing a production rate of X parts per month. To meet demand, operations will be gradually ramping up to meet the 777X production targets. The ramp-up to the target production rates will be done by a combination of additional equipment installation and process improvement projects. This research study involves the use of Discrete event simulation to provide insight into current cell capability and to identify process bottlenecks. Moreover, the simulation model incorporates process variability, the sequence of process steps within the cell, equipment downtime data, and resource constraints. The resulting simulation model was verified by comparing it to actual system performance. The model analysis and improvement recommendations show significant improvement over the current process in terms of cycle time reduction and production rates increase. In the future, the developed model will be updated regularly and will be used as a tool to monitor system throughput and to evaluate the impact of process changes to the overall system. In addition, the developed framework will be used to help other plants in a similar situation.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>