<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T11:55:17Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/126908" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/126908</identifier><datestamp>2021-07-05T14:03:20Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Roy Welsch and Saurabh Amin.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Markham, Randall(Randall Chase)</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Department of Civil and Environmental Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Massachusetts Institute of Technology. Department of Civil and Environmental Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Global Operations Program</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2020-09-03T15:52:29Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2020-09-03T15:52:29Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2020</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2020</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://hdl.handle.net/1721.1/126908</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">1191623607</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, in conjunction with the Leaders for Global Operations Program at MIT, May, 2020</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: S.M., Massachusetts Institute of Technology, Department of Civil and Environmental Engineering, in conjunction with the Leaders for Global Operations Program at MIT, May, 2020</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from the official PDF of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 53-55).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">In supply chain management, it is commonly held that reducing lead times and minimum order quantities (MOQs) from suppliers can drive down the customer's inventory levels substantially. Customers providing a consumption forecast along with a commitment to a supplier to cover some portion of raw material, work-in-process, and finished goods in exchange for reduced lead times and lower MOQs can support that goal; however, there does not exist a general method for identifying and optimizing the terms of these agreements. Existing literature describes techniques that involve vendor-managed inventory and other lead time reduction strategies, but none exists where the customer manages the ordering and replenishment policies from a vendor stock. In this thesis, we investigate a method for a company to reduce lead times and inventory level while maintaining or improving their customer service level. To do so, we introduce a new process for the business where a customer identifies the optimal subset of parts with their corresponding lead time and stocking policy trade-offs to drive inventory reductions relative to the existing state. We describe the benefits for both supplier and customer and specifically focus on the investigation of the opportunity for the customer and the appropriate segmentation of suppliers and parts for consideration in a pilot leading to full implantation. We expect this new approach to substantially reduce the inventory at the customer while improving the suppliers' ability to optimize their own manufacturing planning and setup schedules.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Randall Markham.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="collection" lang="en_US">M.B.A. Massachusetts Institute of Technology, Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="collection" lang="en_US">S.M. Massachusetts Institute of Technology, Department of Civil and Environmental Engineering</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">xii, 55 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Civil and Environmental Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Reducing inventory through supply chain coordination and improved lead times</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="imported" lang="en_US">2020-09-03T15:52:29Z</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="degree" lang="en_US">Master</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="department" lang="en_US">Sloan</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="department" lang="en_US">CivEng</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="4d92c2b1-3b15-4a13-81de-bfef98b39585">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Reducing inventory through supply chain coordination and improved lead times&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2020&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Markham, Randall(Randall Chase)&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Civil and Environmental Engineering.&lt;/Keyword>
    &lt;Keyword>Leaders for Global Operations Program.&lt;/Keyword>
   	&lt;Abstract>In supply chain management, it is commonly held that reducing lead times and minimum order quantities (MOQs) from suppliers can drive down the customer&amp;apos;s inventory levels substantially. Customers providing a consumption forecast along with a commitment to a supplier to cover some portion of raw material, work-in-process, and finished goods in exchange for reduced lead times and lower MOQs can support that goal; however, there does not exist a general method for identifying and optimizing the terms of these agreements. Existing literature describes techniques that involve vendor-managed inventory and other lead time reduction strategies, but none exists where the customer manages the ordering and replenishment policies from a vendor stock. In this thesis, we investigate a method for a company to reduce lead times and inventory level while maintaining or improving their customer service level. To do so, we introduce a new process for the business where a customer identifies the optimal subset of parts with their corresponding lead time and stocking policy trade-offs to drive inventory reductions relative to the existing state. We describe the benefits for both supplier and customer and specifically focus on the investigation of the opportunity for the customer and the appropriate segmentation of suppliers and parts for consideration in a pilot leading to full implantation. We expect this new approach to substantially reduce the inventory at the customer while improving the suppliers&amp;apos; ability to optimize their own manufacturing planning and setup schedules.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>