<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T13:49:25Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/156028" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/156028</identifier><datestamp>2024-08-13T03:02:22Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor">Magnanti, Thomas</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="advisor">Freund, Daniel</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author">Ceballos Mondragón, Regina</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2024-08-12T14:16:23Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2024-08-12T14:16:23Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2024-05</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="submitted">2024-06-25T18:10:19.325Z</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://hdl.handle.net/1721.1/156028</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract">Following NextEra Energy Resources’ accelerated growth and disruptions in the solar panel supply chain, their solar panel allocation process is becoming more complex. This process results in a schedule that determines when to deliver close to 150 million solar panels to more than fifty project sites under development and construction, while balancing requirements from multiple stakeholders. Due to project and contract interdependencies, modifying the equipment delivery schedule leads to costs that have consequential impacts. This thesis presents and implements a novel mixed integer programming model to determine the optimal schedule for delivering solar panels to project sites. The model abstracts impactful and quantifiable costs and minimizes them to propose a realistic solution. It produces a schedule in significantly less time than the current manual approach by finding a feasible solution in less than 15 minutes. The thesis introduces three scenarios of supply chain disruptions that mimic real-world events, demonstrating the model’s flexibility and helping NextEra Energy Resources adapt to future supply chain disruptions.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="publisher">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights">In Copyright - Educational Use Permitted</dim:field>
   <dim:field mdschema="dc" element="rights">Copyright retained by author(s)</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri">https://rightsstatements.org/page/InC-EDU/1.0/</dim:field>
   <dim:field mdschema="dc" element="title">Improving Supply Chain Resiliency through Solar Panel Delivery Optimization</dim:field>
   <dim:field mdschema="dc" element="type">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="mit" element="thesis" qualifier="degree">Master</dim:field>
   <dim:field mdschema="thesis" element="degree" qualifier="name">Master of Science in Electrical Engineering and Computer Science</dim:field>
   <dim:field mdschema="thesis" element="degree" qualifier="name">Master of Business Administration</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="eb962643-63f6-4889-8442-3a0ef5f5202f">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
   	&lt;Title>Improving Supply Chain Resiliency through Solar Panel Delivery Optimization&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2024-05&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Ceballos Mondragón, Regina&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>https://rightsstatements.org/page/InC-EDU/1.0/&lt;/License>
   	&lt;Abstract>Following NextEra Energy Resources’ accelerated growth and disruptions in the solar panel supply chain, their solar panel allocation process is becoming more complex. This process results in a schedule that determines when to deliver close to 150 million solar panels to more than fifty project sites under development and construction, while balancing requirements from multiple stakeholders. Due to project and contract interdependencies, modifying the equipment delivery schedule leads to costs that have consequential impacts. This thesis presents and implements a novel mixed integer programming model to determine the optimal schedule for delivering solar panels to project sites. The model abstracts impactful and quantifiable costs and minimizes them to propose a realistic solution. It produces a schedule in significantly less time than the current manual approach by finding a feasible solution in less than 15 minutes. The thesis introduces three scenarios of supply chain disruptions that mimic real-world events, demonstrating the model’s flexibility and helping NextEra Energy Resources adapt to future supply chain disruptions.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>