<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T00:24:38Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/28634" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/28634</identifier><datestamp>2022-01-13T07:54:23Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Fred Moavenzadeh.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Wang, Shun Linda, 1980-</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Civil and Environmental Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2005-09-27T17:25:54Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2005-09-27T17:25:54Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2004</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2004</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/28634</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">58918023</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2004.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (leaves 79-81).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Management is often frustrated by the lack of motivation generated by end of the year bonuses. Currently, there are two compensation ideals, merit-based versus incentive-based. Merit based compensation correlates compensation to one's job performance, whereas incentive based on set goals and correlates bonus rewards before the time frame used to evaluate the performance. An effective incentive program contributes to a company's overall competitiveness by encouraging superior performance as well as improving the company's earning and cash flow. An incentive compensation program is not a substitute for lack of staff accountability, rather it should be used to motivate individuals and align the goals of individuals with those of the company. The purpose of this study is three-fold. First to determine current incentive package in A/E/C firms and comparing them with other industries' compensation. Second, research how more fitting incentive packages will help to make the industry more efficient, and transform the industry to a non-zero sum situation for all parties. Lastly, determine factors needed to have a complete incentive package, as well as explore possible ways of implementation of the incentive programs. In conclusion, not all A/E/C firms will benefit from incentive programs, but those that are in certain fields of the industry will see an increase in productivity and overall competitiveness of the firm.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Shun Linda Wang.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">89 leaves</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">2392429 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">2402540 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso">en_US</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Civil and Environmental Engineering.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Incentive compensation : bonusing and motivation</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="e90e5573-6af3-42f5-bef3-10349ceb20a9">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>en_US&lt;/Language>
   	&lt;Title>Incentive compensation : bonusing and motivation&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2004&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Wang, Shun Linda, 1980-&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Civil and Environmental Engineering.&lt;/Keyword>
   	&lt;Abstract>Management is often frustrated by the lack of motivation generated by end of the year bonuses. Currently, there are two compensation ideals, merit-based versus incentive-based. Merit based compensation correlates compensation to one&amp;apos;s job performance, whereas incentive based on set goals and correlates bonus rewards before the time frame used to evaluate the performance. An effective incentive program contributes to a company&amp;apos;s overall competitiveness by encouraging superior performance as well as improving the company&amp;apos;s earning and cash flow. An incentive compensation program is not a substitute for lack of staff accountability, rather it should be used to motivate individuals and align the goals of individuals with those of the company. The purpose of this study is three-fold. First to determine current incentive package in A/E/C firms and comparing them with other industries&amp;apos; compensation. Second, research how more fitting incentive packages will help to make the industry more efficient, and transform the industry to a non-zero sum situation for all parties. Lastly, determine factors needed to have a complete incentive package, as well as explore possible ways of implementation of the incentive programs. In conclusion, not all A/E/C firms will benefit from incentive programs, but those that are in certain fields of the industry will see an increase in productivity and overall competitiveness of the firm.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>