<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T15:59:37Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/30134" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/30134</identifier><datestamp>2022-01-13T07:54:23Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Jerome J. Connor and Nathaniel Osgood.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Coste, Amelie, 1982-</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Civil and Environmental Engineering</dim:field>
   <dim:field mdschema="dc" element="coverage" qualifier="spatial" lang="en_US">n-us-ma</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2006-03-24T18:22:43Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2006-03-24T18:22:43Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2004</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2004</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/30134</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">56016207</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2004.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (leaves 75-77).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">This thesis formulates a cost estimate and schedule for constructing the Boston Concert Hall, an innovative hypothetical building composed of two concert halls and a restaurant. Concert Halls are complex and expensive structures due to steep design requirements reflecting their status as signature buildings and because they require extensive furnishing. Restaurants are not as complex but require the same kind of attention in their interior furnishing as well as in the choice of their kitchen equipment. Because the structure houses two complicated entities, feasibility analysis required a careful cost and schedule estimation. On the basis of several assumptions, a rough estimate of the cost and schedule of the entire structure has been developed along with a more detailed estimate of the two auditoriums and the restaurant. The study suggests that the interior finishing of such unique buildings represent a large fraction of their overall costs and construction time.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Amelie Coste.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.Eng.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">77 leaves</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">3060851 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">3060660 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Civil and Environmental Engineering.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Schedule and cost estimate for an innovative Boston Harbor concert hall</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="eafc429c-973b-4423-ba09-055179ead04b">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Schedule and cost estimate for an innovative Boston Harbor concert hall&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2004&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Coste, Amelie, 1982-&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Civil and Environmental Engineering.&lt;/Keyword>
   	&lt;Abstract>This thesis formulates a cost estimate and schedule for constructing the Boston Concert Hall, an innovative hypothetical building composed of two concert halls and a restaurant. Concert Halls are complex and expensive structures due to steep design requirements reflecting their status as signature buildings and because they require extensive furnishing. Restaurants are not as complex but require the same kind of attention in their interior furnishing as well as in the choice of their kitchen equipment. Because the structure houses two complicated entities, feasibility analysis required a careful cost and schedule estimation. On the basis of several assumptions, a rough estimate of the cost and schedule of the entire structure has been developed along with a more detailed estimate of the two auditoriums and the restaurant. The study suggests that the interior finishing of such unique buildings represent a large fraction of their overall costs and construction time.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>