<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T19:40:32Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/34703" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/34703</identifier><datestamp>2026-06-04T17:34:19Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Donald B. Rosenfield and James Masters.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Smith, Kevin M. (Kevin Martin), 1971-</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Manufacturing Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Civil and Environmental Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2006-11-08T16:21:51Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2006-11-08T16:21:51Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2000</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2000</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/34703</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">45502630</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering; in conjunction with the Leaders for Manufacturing Program, Massachusetts Institute of Technology, 2000.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Also available online at the MIT Theses Online homepage &lt;http://thesis.mit.edu>.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 79-80).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">This thesis examines issues which must be resolved before implementing a Supplier- Managed Inventory (SMI) program. The research was conducted at a partner company of the Leaders for Manufacturing (LFM) program. The goal of the research was to lay the groundwork for a pilot SMI plan to be implemented in 2000. In manufacturing companies, there is a current focus on supply chain issues, with inventory reduction being one of the main goals of any supply chain initiative. In today's competitive business environment, inventory reduction can not be gained at the expense of customer service - the customers can take their business elsewhere. One method to reduce inventory and improve service levels is through an SMI program. Under SMI, the manufacturer's suppliers will hold, manage, and deliver materials to the manufacturer as needed to support production. The manufacturer will support the suppliers by giving them more accurate forecasts and real-time demand. SMI is a partnership that requires close cooperation between both parties. Everyone wins - the manufacturer decreases inventory costs and increases service levels, the supplier reduces safety stock levels and smothers out production. There are a number of issues to address before implementing a SMI program, ranging from information technology to new metrics for suppliers. While these issues will be explored, the thesis analyzes in-depth two key areas which must be understood in order to successfully implement an SMI program: Demand Forecasting and Inventory Stocking Levels.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Kevin M. Smith.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">80 p.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">4910997 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">4910755 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Civil and Environmental Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Implementation issues of a supplier-managed inventory program</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="bec58dc1-4953-4e47-8baa-3344029918d6">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Implementation issues of a supplier-managed inventory program&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2000&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Smith, Kevin M. (Kevin Martin), 1971-&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Civil and Environmental Engineering.&lt;/Keyword>
    &lt;Keyword>Leaders for Manufacturing Program.&lt;/Keyword>
   	&lt;Abstract>This thesis examines issues which must be resolved before implementing a Supplier- Managed Inventory (SMI) program. The research was conducted at a partner company of the Leaders for Manufacturing (LFM) program. The goal of the research was to lay the groundwork for a pilot SMI plan to be implemented in 2000. In manufacturing companies, there is a current focus on supply chain issues, with inventory reduction being one of the main goals of any supply chain initiative. In today&amp;apos;s competitive business environment, inventory reduction can not be gained at the expense of customer service - the customers can take their business elsewhere. One method to reduce inventory and improve service levels is through an SMI program. Under SMI, the manufacturer&amp;apos;s suppliers will hold, manage, and deliver materials to the manufacturer as needed to support production. The manufacturer will support the suppliers by giving them more accurate forecasts and real-time demand. SMI is a partnership that requires close cooperation between both parties. Everyone wins - the manufacturer decreases inventory costs and increases service levels, the supplier reduces safety stock levels and smothers out production. There are a number of issues to address before implementing a SMI program, ranging from information technology to new metrics for suppliers. While these issues will be explored, the thesis analyzes in-depth two key areas which must be understood in order to successfully implement an SMI program: Demand Forecasting and Inventory Stocking Levels.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>