<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T11:15:41Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/34850" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/34850</identifier><datestamp>2022-01-28T19:25:57Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Jan A. Klein and David E. Hardt.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Lindell, Heather M. (Heather Marie)</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Manufacturing Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2006-11-08T16:49:01Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2006-11-08T16:49:01Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2005</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2005</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/34850</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">63199850</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2005.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 73-74).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">This thesis delves into the strategic and organizational challenges of implementing process control plans for a vehicle launch. The author explores the development and implementation of process control plans employing lean philosophies such as Standardization, Built-in-quality, and Continuous Improvement. This thesis is based on the work of a seven month internship at an automaker. The focus of the internship was the development and implementation of process controls in the body shop of an automotive assembly plant. The process control strategy focuses on specific areas such as the dimensional control of the body-in-white assembly and the weld monitoring process, where solid control strategies are vital. The internship supported the launch of a new passenger car, though references to the automaker and assembly plant have been removed. An organizational change analysis of the process control initiative is offered. Finally, lessons learned and recommendations for change management and continuous improvement of the process control initiative are presented.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Heather M. Lindell.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">74 p.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">3262941 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">3265940 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">The development and implementation of process control strategy on a vehicle launch</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="f6978306-769a-4377-a462-59b6f144e76e">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>The development and implementation of process control strategy on a vehicle launch&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2005&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Lindell, Heather M. (Heather Marie)&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
    &lt;Keyword>Leaders for Manufacturing Program.&lt;/Keyword>
   	&lt;Abstract>This thesis delves into the strategic and organizational challenges of implementing process control plans for a vehicle launch. The author explores the development and implementation of process control plans employing lean philosophies such as Standardization, Built-in-quality, and Continuous Improvement. This thesis is based on the work of a seven month internship at an automaker. The focus of the internship was the development and implementation of process controls in the body shop of an automotive assembly plant. The process control strategy focuses on specific areas such as the dimensional control of the body-in-white assembly and the weld monitoring process, where solid control strategies are vital. The internship supported the launch of a new passenger car, though references to the automaker and assembly plant have been removed. An organizational change analysis of the process control initiative is offered. Finally, lessons learned and recommendations for change management and continuous improvement of the process control initiative are presented.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>