<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T23:29:28Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/35114" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/35114</identifier><datestamp>2022-01-13T07:55:19Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Michael Norton.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Devine, Paul (Paul S.)</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">System Design and Management Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">System Design and Management Program.</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2006-12-18T20:42:52Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2006-12-18T20:42:52Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2004</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2006</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/35114</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">71519964</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (S.M.)--Massachusetts Institute of Technology, System Design and Management Program, June 2006.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 66).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Deciding on which reliability &amp; performance improvement projects to launch or to reject has historically been an extremely challenging responsibility of Teradyne management. Incorrect decisions can lead to major customer dissatisfaction, which may subsequently lead to loss of market share. Teradyne Engineering and Marketing team have been trying to develop a tool that would assist in their reliability improvement project decision making. The challenge is the dynamic aspects of the reliability improvement projects. Like most engineering projects, reliability improvement projects have variables such as internal workforce, productivity, skill sets, customer expectations and many others that are in constant motion. These variables make the assessment of reliability projects extremely difficult in a static framework. This research will incorporate these key variables into a dynamic framework to help assess individual reliability improvement projects.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Paul Devine.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">68 p.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">4378937 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">4381251 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">System Design and Management Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Reliability improvement project decision making : water cooling system redesign</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="7def0a03-14fb-4e33-896e-0905ca88d3b7">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Reliability improvement project decision making : water cooling system redesign&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2006&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Devine, Paul (Paul S.)&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>System Design and Management Program.&lt;/Keyword>
   	&lt;Abstract>Deciding on which reliability &amp;amp; performance improvement projects to launch or to reject has historically been an extremely challenging responsibility of Teradyne management. Incorrect decisions can lead to major customer dissatisfaction, which may subsequently lead to loss of market share. Teradyne Engineering and Marketing team have been trying to develop a tool that would assist in their reliability improvement project decision making. The challenge is the dynamic aspects of the reliability improvement projects. Like most engineering projects, reliability improvement projects have variables such as internal workforce, productivity, skill sets, customer expectations and many others that are in constant motion. These variables make the assessment of reliability projects extremely difficult in a static framework. This research will incorporate these key variables into a dynamic framework to help assess individual reliability improvement projects.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>