<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T22:16:59Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/37133" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/37133</identifier><datestamp>2022-01-28T21:10:09Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">David Simchi-Levi and Janice Klein.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Hiroshige, Scott K. (Scott Kiyoshi), 1977-</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Manufacturing Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2007-04-03T17:15:18Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2007-04-03T17:15:18Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2006</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2006</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/37133</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">85811860</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science; in conjunction with the Leaders for Manufacturing Program at MIT, 2006.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 69-70).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">In December 2004, a manager at Raytheon Company articulated in the form of an LFM (Leaders for Manufacturing) internship proposal his belief that someone should do something about the amounts of time and money that Raytheon's North Texas plants spent handling expedite requests-requests that someone provide goods or services more quickly than normal. This thesis attempts to summarize the thoughts, learnings, initiatives, and outcomes associated with the ensuing effort. In particular, a large section of the paper is devoted to a case study of the most involved initiative: the devising and implementing of a new dispatching method in one small but central operation in an organization with a long history of processing things first in, first out. While for the project team the compelling factor was achieving a specific dollar impact, the reader of this paper will probably be more interested in the methodology than in Raytheon's ROI. Research for this thesis was conducted during a six-month internship with Raytheon Company's Space and Airborne Systems Supply Chain Management group in McKinney, TX, and Dallas, TX. The internship was affiliated with the Massachusetts Institute of Technology's Leaders for Manufacturing (LFM) Program.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Scott K. Hiroshige.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">98 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Electrical Engineering and Computer Science.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Expedite requests in Raytheon's North Texas supply chain</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="5af30d7a-0c99-447e-b7ca-2456bfafa48d">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Expedite requests in Raytheon&amp;apos;s North Texas supply chain&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2006&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Hiroshige, Scott K. (Scott Kiyoshi), 1977-&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Electrical Engineering and Computer Science.&lt;/Keyword>
    &lt;Keyword>Leaders for Manufacturing Program.&lt;/Keyword>
   	&lt;Abstract>In December 2004, a manager at Raytheon Company articulated in the form of an LFM (Leaders for Manufacturing) internship proposal his belief that someone should do something about the amounts of time and money that Raytheon&amp;apos;s North Texas plants spent handling expedite requests-requests that someone provide goods or services more quickly than normal. This thesis attempts to summarize the thoughts, learnings, initiatives, and outcomes associated with the ensuing effort. In particular, a large section of the paper is devoted to a case study of the most involved initiative: the devising and implementing of a new dispatching method in one small but central operation in an organization with a long history of processing things first in, first out. While for the project team the compelling factor was achieving a specific dollar impact, the reader of this paper will probably be more interested in the methodology than in Raytheon&amp;apos;s ROI. Research for this thesis was conducted during a six-month internship with Raytheon Company&amp;apos;s Space and Airborne Systems Supply Chain Management group in McKinney, TX, and Dallas, TX. The internship was affiliated with the Massachusetts Institute of Technology&amp;apos;s Leaders for Manufacturing (LFM) Program.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>