<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T23:15:01Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/39590" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/39590</identifier><datestamp>2022-01-28T19:04:20Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">David E. Hardt and Roy E. Welsch.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Einhorn, Marshall</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Manufacturing Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2007-11-16T14:29:49Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2007-11-16T14:29:49Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2007</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2007</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/39590</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">175301474</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2007.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 61).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">In any production environment, managing demand variability is a delicate balancing act. Firms must constantly weigh potential obsolescence costs of unused inventory (should sales not materialize) against potential expedite costs or lost sales (should demand outpace available inventory). For build-to-order manufacturers such as Dell, the balancing act is even more challenging. While it offers a wide array of products, Dell does not hold its safety stock in the form of finished goods inventory. Instead, safety stock is held as parts inventory, sitting in supplier-owned supplier logistics centers. As a result, supplier stocking decisions may impact Dell's ability to respond to forecast variability. Other factors, such as globalization, product proliferation, and geo-manufacturing, all magnify the impact variability has on the forecasting process. This thesis discusses two methods of dealing with demand variability. First, it examines the potential application of statistical modeling techniques to the part-level forecasting process.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">(cont.) In particular, it looks at the use of time series models to forecast part-level demand. While the results did not merit a recommendation to utilize time series forecasts across the board (in lieu of the current process), certain supplemental applications of such forecasts would benefit Dell. Second, it examines how hedging is currently utilized as a means to account for demand variability. While beneficial to Dell on the surface, a consistent hedge to the forecast is potentially detrimental to its vendor relationships. It has the direct impact of driving excess inventory onto the books of its vendors and it has the indirect impact of higher per part costs to Dell. It also exposes Dell to part shortages due to supplier decommits. To help counter these effects, the thesis identifies potential changes to the hedging process that Dell should consider.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">y Marshall Einhorn.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">61 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Managing forecast variability in a build-to-order environment</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="5d5221ca-cc6f-4346-bd0e-08ddddcd3c37">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Managing forecast variability in a build-to-order environment&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2007&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Einhorn, Marshall&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
    &lt;Keyword>Leaders for Manufacturing Program.&lt;/Keyword>
   	&lt;Abstract>In any production environment, managing demand variability is a delicate balancing act. Firms must constantly weigh potential obsolescence costs of unused inventory (should sales not materialize) against potential expedite costs or lost sales (should demand outpace available inventory). For build-to-order manufacturers such as Dell, the balancing act is even more challenging. While it offers a wide array of products, Dell does not hold its safety stock in the form of finished goods inventory. Instead, safety stock is held as parts inventory, sitting in supplier-owned supplier logistics centers. As a result, supplier stocking decisions may impact Dell&amp;apos;s ability to respond to forecast variability. Other factors, such as globalization, product proliferation, and geo-manufacturing, all magnify the impact variability has on the forecasting process. This thesis discusses two methods of dealing with demand variability. First, it examines the potential application of statistical modeling techniques to the part-level forecasting process.&lt;/Abstract>
   	&lt;Abstract>(cont.) In particular, it looks at the use of time series models to forecast part-level demand. While the results did not merit a recommendation to utilize time series forecasts across the board (in lieu of the current process), certain supplemental applications of such forecasts would benefit Dell. Second, it examines how hedging is currently utilized as a means to account for demand variability. While beneficial to Dell on the surface, a consistent hedge to the forecast is potentially detrimental to its vendor relationships. It has the direct impact of driving excess inventory onto the books of its vendors and it has the indirect impact of higher per part costs to Dell. It also exposes Dell to part shortages due to supplier decommits. To help counter these effects, the thesis identifies potential changes to the hedging process that Dell should consider.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>