<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T11:40:19Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/43051" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/43051</identifier><datestamp>2022-01-13T07:54:23Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Patrick Jaillet.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Aydın, Cevat Onur</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Civil and Environmental Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2008-11-07T18:56:28Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2008-11-07T18:56:28Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2008</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2008</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/43051</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">243854208</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2008.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (leaves 86-90).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">In this thesis, we consider sequential real investment decisions for the development of discovered oil prospects. Following a decision analysis approach, we propose a methodology to explore the upside of a dynamic drilling strategy, where there is a significant uncertainty about the reservoir complexity. We introduce the notion of information lag, whereby the decision-maker receives the information with a certain delay after each drilling is completed. In an illustrative case study, we apply our proposed methodology on a single reservoir to characterize the value of flexibility and to describe the relative impact of the information lags, in the context of an extensive drilling plan. We also provide several extensions of this case study in order to show how this methodology would be extended in a more comprehensive decision framework. Topics include choosing the optimal production capacity, valuing an initial test opportunity, and developing a field with multiple reservoirs. Our results indicate that flexible thinking may be a significant source of value to the projects. However, the incremental value might be over-rated if information lags are not appropriately included in the analysis.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Cevat Onur Aydın.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">90 leaves</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by 
copyright. They may be viewed from this source for any purpose, but 
reproduction or distribution in any format is prohibited without written 
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Civil and Environmental Engineering.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Sequential investment planning for complex oil development projects</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="9a3f133e-10b4-42a9-8b75-53d24ccf28dd">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Sequential investment planning for complex oil development projects&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2008&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Aydın, Cevat Onur&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Civil and Environmental Engineering.&lt;/Keyword>
   	&lt;Abstract>In this thesis, we consider sequential real investment decisions for the development of discovered oil prospects. Following a decision analysis approach, we propose a methodology to explore the upside of a dynamic drilling strategy, where there is a significant uncertainty about the reservoir complexity. We introduce the notion of information lag, whereby the decision-maker receives the information with a certain delay after each drilling is completed. In an illustrative case study, we apply our proposed methodology on a single reservoir to characterize the value of flexibility and to describe the relative impact of the information lags, in the context of an extensive drilling plan. We also provide several extensions of this case study in order to show how this methodology would be extended in a more comprehensive decision framework. Topics include choosing the optimal production capacity, valuing an initial test opportunity, and developing a field with multiple reservoirs. Our results indicate that flexible thinking may be a significant source of value to the projects. However, the incremental value might be over-rated if information lags are not appropriately included in the analysis.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>