<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T17:14:54Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/50091" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/50091</identifier><datestamp>2022-01-28T21:24:03Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">David Simchi-Levi and Don Rosenfield.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Pai, Neelesh G</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Manufacturing Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2009-12-10T19:11:14Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2009-12-10T19:11:14Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2009</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2009</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/50091</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">458576863</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science; in conjunction with the Leaders for Manufacturing Program at MIT, 2009.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 94-95).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Intel has recently embarked on a mission to improve its supply chain responsiveness. Currently production lead times are around 4 months requiring a forecast a quarter out. Most customer demand changes happen within lead time since customers only know their demand a few weeks before shipment. While stable production plans help maintain factory utilization rates their inflexibility can also lead to missed revenue opportunities or unneeded inventory. The challenge then is to make planning processes agile enough to react to late demand changes. The FAB has a 2-3 month throughput time or latency. The subsequent Assembly-Test (ATM) operation has a 1-2 month latency. Increasing competition requires the striking of a balance between competitive service levels and excess inventory. This Thesis looks to develop ways of making more real-time tactical demand updates to production plans used by the global factory network to improve Supply Chain Responsiveness. Using business analytics and organizational processes analysis, ways of making late demand changes to the production plan are evaluated. The project focuses on Intel's global ATM network due to its proximity to end customer demand. A holistic solution to use available intelligence is proposed. The focus is on creating data visibility across the supply chain and on putting feedback loops in planning processes to intercept planning processes at various points with new information as and when it becomes available.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">(cont.) Issues examined include demand signal generation, the choice of different demand signals, solver algorithms to convert demand inputs to a global production plan, inventory target setting and implementation in production plan and finally ATM processes such as SDD (delayed product differentiation at the semi-finished goods warehouse) for Product Mix and volume determination. The hypothesis is that this will lead to a better understanding of the interaction between various planning processes.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Neelesh Pai.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">98 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by &#xd;
copyright. They may be viewed from this source for any purpose, but &#xd;
reproduction or distribution in any format is prohibited without written &#xd;
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Electrical Engineering and Computer Science.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Making real-time precision adjustments to world-wide chip production</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="9dae43f0-0149-44bd-a410-42aefe8dacca">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Making real-time precision adjustments to world-wide chip production&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2009&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Pai, Neelesh G&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Electrical Engineering and Computer Science.&lt;/Keyword>
    &lt;Keyword>Leaders for Manufacturing Program.&lt;/Keyword>
   	&lt;Abstract>Intel has recently embarked on a mission to improve its supply chain responsiveness. Currently production lead times are around 4 months requiring a forecast a quarter out. Most customer demand changes happen within lead time since customers only know their demand a few weeks before shipment. While stable production plans help maintain factory utilization rates their inflexibility can also lead to missed revenue opportunities or unneeded inventory. The challenge then is to make planning processes agile enough to react to late demand changes. The FAB has a 2-3 month throughput time or latency. The subsequent Assembly-Test (ATM) operation has a 1-2 month latency. Increasing competition requires the striking of a balance between competitive service levels and excess inventory. This Thesis looks to develop ways of making more real-time tactical demand updates to production plans used by the global factory network to improve Supply Chain Responsiveness. Using business analytics and organizational processes analysis, ways of making late demand changes to the production plan are evaluated. The project focuses on Intel&amp;apos;s global ATM network due to its proximity to end customer demand. A holistic solution to use available intelligence is proposed. The focus is on creating data visibility across the supply chain and on putting feedback loops in planning processes to intercept planning processes at various points with new information as and when it becomes available.&lt;/Abstract>
   	&lt;Abstract>(cont.) Issues examined include demand signal generation, the choice of different demand signals, solver algorithms to convert demand inputs to a global production plan, inventory target setting and implementation in production plan and finally ATM processes such as SDD (delayed product differentiation at the semi-finished goods warehouse) for Product Mix and volume determination. The hypothesis is that this will lead to a better understanding of the interaction between various planning processes.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>