<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T07:56:20Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/55232" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/55232</identifier><datestamp>2022-01-13T07:54:36Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Stanley B. Gershwin.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Rizvi, Syed Zia Abbas</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Dept. of Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2010-05-25T21:07:41Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2010-05-25T21:07:41Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2009</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2009</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/55232</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">611962891</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 101).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">The project work presented in this thesis has proposed solutions related to the control of production and work-in-process inventory in a multi-item multi-stage manufacturing system. A suitable base-stock inventory control policy is recommended to ensure that the desired service levels are maintained between production stages and for the final customers. Concept of coupling the production lines though coupling-stock under suitable assumptions is then introduced to reduce the stock levels at certain consecutive production stages. A framework for demand seasonality and characteristic analysis is also established to enable the inventory control policy to respond to seasonal variations. Monte Carlo simulation was performed on a model of chain of production stages controlled under base-stock policy for the verification of results and to study the effects of stock-outs on base-stock levels. The results of simulation study showed that overall system performance is satisfactory and desired service levels were achieved. Simulation work was also carried out to validate the line coupling concept and its performance under certain conditions. A novel Kanban based visual management system design, which is aligned with the requirements of inventory control policy, along with the material transfer batch sizes between production stages is proposed to facilitate the implementation of inventory control policy. Furthermore, capacitated shipment planning approach is proposed and implemented in form of a spreadsheet-based interface to aid planning personnel in shipment planning under the constraints provided by the inventory control policy.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Syed Zia Abbas Rizvi.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.Eng.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">111 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by 
copyright. They may be viewed from this source for any purpose, but 
reproduction or distribution in any format is prohibited without written 
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Production and inventory control of a multi-item multi-stage manufacturing system : simulation modeling, capacitated shipment planning and Kanban design</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="a1238c92-3fdd-4054-b27a-9808d0158118">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Production and inventory control of a multi-item multi-stage manufacturing system : simulation modeling, capacitated shipment planning and Kanban design&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn&gt;
   	&lt;PublicationDate>2009&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Rizvi, Syed Zia Abbas&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
   	&lt;Abstract>The project work presented in this thesis has proposed solutions related to the control of production and work-in-process inventory in a multi-item multi-stage manufacturing system. A suitable base-stock inventory control policy is recommended to ensure that the desired service levels are maintained between production stages and for the final customers. Concept of coupling the production lines though coupling-stock under suitable assumptions is then introduced to reduce the stock levels at certain consecutive production stages. A framework for demand seasonality and characteristic analysis is also established to enable the inventory control policy to respond to seasonal variations. Monte Carlo simulation was performed on a model of chain of production stages controlled under base-stock policy for the verification of results and to study the effects of stock-outs on base-stock levels. The results of simulation study showed that overall system performance is satisfactory and desired service levels were achieved. Simulation work was also carried out to validate the line coupling concept and its performance under certain conditions. A novel Kanban based visual management system design, which is aligned with the requirements of inventory control policy, along with the material transfer batch sizes between production stages is proposed to facilitate the implementation of inventory control policy. Furthermore, capacitated shipment planning approach is proposed and implemented in form of a spreadsheet-based interface to aid planning personnel in shipment planning under the constraints provided by the inventory control policy.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>