<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T04:43:19Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/61905" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/61905</identifier><datestamp>2026-06-05T20:27:36Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec><setSpec>col_1721.1_131024</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Trent R. Gooding and Pat Hale.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Netemeyer, Kristopher David</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Engineering Systems Division.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Engineering Systems Division</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2011-03-24T20:24:31Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2011-03-24T20:24:31Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2010</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2010</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/61905</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">706827668</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (Nav. E.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (S.M. in Engineering and Management)--Massachusetts Institute of Technology, Engineering Systems Division, 2010.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Paged in Arabic numerals except p. 1-8 and p. 89-90, which are in Roman numerals. Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. lxxxix (89)-xc (90)).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Alternative methods for cost estimation are important in the early conceptual stages of a design when there is not enough detail to allow for a traditional quantity takeoff estimate to be performed. Much of the budgeting process takes place during the early stages of a design and it is important to be able to develop a budget quality estimate so a design is allocated the necessary resources to meet stakeholder requirements. Accurate project cost estimates early in the planning and design processes can also serve as a cost-control measure to assist in managing the design process. With an understanding of the most significant engineering decisions that affect project costs, project team members and stakeholders can proactively make cost-effective decisions during the design process rather than after construction begins and it is too late to prevent going over budget. This research examines the potential of Artificial Neural Networks (ANNs) as a tool to support the tasks of cost prediction, mapping costs to engineering decisions, and risk management during the early stages of a design's life-cycle. ANNs are a modeling tool based on the computational paradigm of the human brain and have proved to be a robust and reliable method for prediction, ranking, classification, and interpretation or processing of data.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">Kristopher David Netemeyer.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M. in Engineering and Management</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Nav.E.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">177 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by 
copyright. They may be viewed from this source for any purpose, but 
reproduction or distribution in any format is prohibited without written 
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Engineering Systems Division.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">A quantitative methodology for mapping project costs to engineering decisions in naval ship design and procurement</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="b52bcbab-8428-41c8-8e23-e89701793c9e">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>A quantitative methodology for mapping project costs to engineering decisions in naval ship design and procurement&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2010&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Netemeyer, Kristopher David&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
    &lt;Keyword>Engineering Systems Division.&lt;/Keyword>
   	&lt;Abstract>Alternative methods for cost estimation are important in the early conceptual stages of a design when there is not enough detail to allow for a traditional quantity takeoff estimate to be performed. Much of the budgeting process takes place during the early stages of a design and it is important to be able to develop a budget quality estimate so a design is allocated the necessary resources to meet stakeholder requirements. Accurate project cost estimates early in the planning and design processes can also serve as a cost-control measure to assist in managing the design process. With an understanding of the most significant engineering decisions that affect project costs, project team members and stakeholders can proactively make cost-effective decisions during the design process rather than after construction begins and it is too late to prevent going over budget. This research examines the potential of Artificial Neural Networks (ANNs) as a tool to support the tasks of cost prediction, mapping costs to engineering decisions, and risk management during the early stages of a design&amp;apos;s life-cycle. ANNs are a modeling tool based on the computational paradigm of the human brain and have proved to be a robust and reliable method for prediction, ranking, classification, and interpretation or processing of data.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>