<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T13:30:29Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/62503" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/62503</identifier><datestamp>2022-01-13T07:54:36Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Kamal Youcef-Toumi.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Liu, Ren, M. Eng. Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Dept. of Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2011-04-25T16:09:56Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2011-04-25T16:09:56Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2010</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2010</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/62503</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">712599309</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 62).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">This thesis describes the implementation of three Kaizen events designed to improve efficiency on a gauge production line which consists of both semiconductor and mechanical equipment for manufacturing complex products with low volume and high configuration mix. A kitting process design reduced cycle time by 12 minutes in the mechanical assembly and by 3 minutes in the packing. A redesigned fixture improved loading and unloading time at the auto calibration. Use of this fixture decreased setup and dismantlement in one batch by 16 minutes. A newly designed jig made multiple loading available in batch of 8 at the vibration test, in which case, 17.5 minutes were reduced from the cycle time.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Ren Liu.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.Eng.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">71 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by 
copyright. They may be viewed from this source for any purpose, but 
reproduction or distribution in any format is prohibited without written 
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Kaizen events implementation for cycle time reduction in gauge production line</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="de51532d-2149-466c-a9aa-bea9017075c3">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Kaizen events implementation for cycle time reduction in gauge production line&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2010&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author&gt;
        	&lt;DisplayName>Liu, Ren, M. Eng. Massachusetts Institute of Technology&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
   	&lt;Abstract>This thesis describes the implementation of three Kaizen events designed to improve efficiency on a gauge production line which consists of both semiconductor and mechanical equipment for manufacturing complex products with low volume and high configuration mix. A kitting process design reduced cycle time by 12 minutes in the mechanical assembly and by 3 minutes in the packing. A redesigned fixture improved loading and unloading time at the auto calibration. Use of this fixture decreased setup and dismantlement in one batch by 16 minutes. A newly designed jig made multiple loading available in batch of 8 at the vibration test, in which case, 17.5 minutes were reduced from the cycle time.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>