<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T12:49:29Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/70276" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/70276</identifier><datestamp>2022-01-13T07:54:12Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Leonard J. Morse-Fortier.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Taneda, Makoto</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Dept. of Architecture.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Architecture</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2012-04-26T18:34:43Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2012-04-26T18:34:43Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">1996</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">1996</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/70276</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">35846140</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Architecture, 1996.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (leaves 115-116).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">In this study, we have examined the application of Lee analysis method to the construction and renovation stages of a building project. The application of the Lee analysis is currently limited to the very early stages of a project life, namely at the concept and design stages. We propose application of the Lee method, with several modifications, to the construction and renovation stages. The simplified Lee method is proposed and examined in the first two case studies. The simplified method limits the range and complexity of data inputs, and is intended to be an Lee used by engineers practicing in the construction industry. In the third case study, the "Lee per square-foot", which implements the concept of the "square-foot" cost estimating, is proposed. This method is intended to be used to assess the residual value and to estimate running costs of an existing building. Necessary modifications of the Lee, as well as the accuracy and limits of these new methods are examined through three case studies.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Makoto Taneda.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.S.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">116 leaves</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by 
copyright. They may be viewed from this source for any purpose, but 
reproduction or distribution in any format is prohibited without written 
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Architecture.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Application of life cycle costing method to a renovation project</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="c00172d0-8e1d-4040-a22f-0cdac01a7eb9">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Application of life cycle costing method to a renovation project&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>1996&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Taneda, Makoto&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Architecture.&lt;/Keyword>
   	&lt;Abstract>In this study, we have examined the application of Lee analysis method to the construction and renovation stages of a building project. The application of the Lee analysis is currently limited to the very early stages of a project life, namely at the concept and design stages. We propose application of the Lee method, with several modifications, to the construction and renovation stages. The simplified Lee method is proposed and examined in the first two case studies. The simplified method limits the range and complexity of data inputs, and is intended to be an Lee used by engineers practicing in the construction industry. In the third case study, the &amp;quot;Lee per square-foot&amp;quot;, which implements the concept of the &amp;quot;square-foot&amp;quot; cost estimating, is proposed. This method is intended to be used to assess the residual value and to estimate running costs of an existing building. Necessary modifications of the Lee, as well as the accuracy and limits of these new methods are examined through three case studies.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>