<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T18:52:45Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/73395" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/73395</identifier><datestamp>2022-01-27T21:28:40Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Roy Welsch and Daniel Whitney.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Millerd, Paul, M.B.A. Massachusetts Institute of Technology.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Global Operations Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Engineering Systems Division</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2012-09-27T15:28:58Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2012-09-27T15:28:58Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2012</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2012</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/73395</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">810131167</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Global Operations Program at MIT, 2012.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 62).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Many companies have implemented lean and six sigma programs over the past twenty years. Lean has been a proven system that has eliminated waste and created value at many companies throughout the world. Raytheon IDS's lean program, "Raytheon Six Sigma" became a top priority in the past ten years at the Integrated Air Defense Center (IADC) in Andover, MA. However, as Raytheon's corporate goals state, they want to take this further and bring "Raytheon Six Sigma" to the next level, fully engaging customers and partners. A focus of this continuous improvement effort was the Electronics Assembly Rack manufacturing cell, which was experiencing high levels of cycle time variability. To help reduce cycle times within the cell, a continuous improvement project was undertaken to improve the material flow process. A current state analysis of the process showed an opportunity to improve process standardization and prioritization while lowering inventory levels. In addition to working with managers from EA to evaluate the material flow process, a kitting cart was developed with a cross functional project team to serve as a tool to help improve the process. Although the improvements were not rolled out to the entire cell during the project, a successful pilot was conducted that helped improve engagement with operators and create a path for future success.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Paul Millerd.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">62 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by &#xd;
copyright. They may be viewed from this source for any purpose, but &#xd;
reproduction or distribution in any format is prohibited without written &#xd;
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Engineering Systems Division.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Driving cycle time reduction through an improved material flow process in the electronics assembly manufacturing cell</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="7607c756-bd18-45ef-a578-275a706f0864">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Driving cycle time reduction through an improved material flow process in the electronics assembly manufacturing cell&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2012&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Millerd, Paul, M.B.A. Massachusetts Institute of Technology.&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Engineering Systems Division.&lt;/Keyword>
    &lt;Keyword>Leaders for Global Operations Program.&lt;/Keyword>
   	&lt;Abstract>Many companies have implemented lean and six sigma programs over the past twenty years. Lean has been a proven system that has eliminated waste and created value at many companies throughout the world. Raytheon IDS&amp;apos;s lean program, &amp;quot;Raytheon Six Sigma&amp;quot; became a top priority in the past ten years at the Integrated Air Defense Center (IADC) in Andover, MA. However, as Raytheon&amp;apos;s corporate goals state, they want to take this further and bring &amp;quot;Raytheon Six Sigma&amp;quot; to the next level, fully engaging customers and partners. A focus of this continuous improvement effort was the Electronics Assembly Rack manufacturing cell, which was experiencing high levels of cycle time variability. To help reduce cycle times within the cell, a continuous improvement project was undertaken to improve the material flow process. A current state analysis of the process showed an opportunity to improve process standardization and prioritization while lowering inventory levels. In addition to working with managers from EA to evaluate the material flow process, a kitting cart was developed with a cross functional project team to serve as a tool to help improve the process. Although the improvements were not rolled out to the entire cell during the project, a successful pilot was conducted that helped improve engagement with operators and create a path for future success.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>