<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T22:52:41Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/76144" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/76144</identifier><datestamp>2022-01-28T18:32:13Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Donald Rosenfield and Daniel Whitney.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Hsu, David T. (David Ta-wei)</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Manufacturing Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Engineering Systems Division</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2013-01-07T21:24:29Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2013-01-07T21:24:29Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2009</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2009</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/76144</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">822282348</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Manufacturing Program at MIT, 2009.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 85-88).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Aerospace firms continue to outsource increasingly complex components and systems for access to talent, lower costs, and global presence. In addition to strong competition from Airbus and other emergent companies, Boeing is faced with the challenge of reducing financial risk and placing work internationally to offset foreign sales obligations. The organization has recognized a need for an integrated framework to consistently make sourcing decisions that limits subjectivity and positions the company for continued success. This thesis is based on a six-month internship study with the Future Production System team based in Seattle, WA and it examines the strategic sourcing decision process at Boeing Commercial Airplanes. A discussion-based strategic sourcing process utilizing a holistic range of factors is proposed to test whether an expensive, complex, and integrated system like a composite airplane wing should be outsourced or if it should be designed and produced internally. This workshop-based strategy development process develops weighted factors through a structured, cross-functional process where multiple proposals can be evaluated based on their performance against a set of quantitative and qualitative factors such as cost, quality, flow, knowledge management, stability, and risk. The development of a baseline sourcing proposal for a composite airplane wing demonstrated the process. Careful assumptions were made and data collected to ensure a realistic scenario for a future single-aisle plane. The documented baseline wing sourcing strategy includes recommendations for proximity, design integration, and production responsibilities.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by David T. Hsu.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">95 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by &#xd;
copyright. They may be viewed from this source for any purpose, but &#xd;
reproduction or distribution in any format is prohibited without written &#xd;
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Engineering Systems Division.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Manufacturing Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">An integrated strategic sourcing process for complex systems</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="a1c8b43c-5c0f-4526-8cef-a164ec7c35fa">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>An integrated strategic sourcing process for complex systems&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2009&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Hsu, David T. (David Ta-wei)&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Engineering Systems Division.&lt;/Keyword>
    &lt;Keyword>Leaders for Manufacturing Program.&lt;/Keyword>
   	&lt;Abstract>Aerospace firms continue to outsource increasingly complex components and systems for access to talent, lower costs, and global presence. In addition to strong competition from Airbus and other emergent companies, Boeing is faced with the challenge of reducing financial risk and placing work internationally to offset foreign sales obligations. The organization has recognized a need for an integrated framework to consistently make sourcing decisions that limits subjectivity and positions the company for continued success. This thesis is based on a six-month internship study with the Future Production System team based in Seattle, WA and it examines the strategic sourcing decision process at Boeing Commercial Airplanes. A discussion-based strategic sourcing process utilizing a holistic range of factors is proposed to test whether an expensive, complex, and integrated system like a composite airplane wing should be outsourced or if it should be designed and produced internally. This workshop-based strategy development process develops weighted factors through a structured, cross-functional process where multiple proposals can be evaluated based on their performance against a set of quantitative and qualitative factors such as cost, quality, flow, knowledge management, stability, and risk. The development of a baseline sourcing proposal for a composite airplane wing demonstrated the process. Careful assumptions were made and data collected to ensure a realistic scenario for a future single-aisle plane. The documented baseline wing sourcing strategy includes recommendations for proximity, design integration, and production responsibilities.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>