<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T10:21:10Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/79556" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/79556</identifier><datestamp>2022-01-13T07:55:22Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131022</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Joel Clark and Randolph Kirchain.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Brommer, Tracey H. (Tracey Helenius)</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Department of Materials Science and Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Materials Science and Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2013-07-10T14:54:23Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2013-07-10T14:54:23Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2013</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2013</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/79556</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">851443040</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (Ph. D.)--Massachusetts Institute of Technology, Dept. of Materials Science and Engineering, 2013.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 212-219).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">The growing motivation for aluminum recycling has prompted interest in recycling alternative and more challenging secondary materials. The nature of these alternative secondary materials necessitates the development of an intermediate recycling facility that can reprocess the secondary materials into a liquid product. Two downstream aluminum remelters will incorporate the liquid products into their aluminum alloy production schedules. Energy and environmental benefits result from delivering the products as liquid but coordination challenges persist because of the energy cost to maintain the liquid. Further coordination challenges result from the necessity to establish a long term recycling production plan in the presence of long term downstream aluminum remelter production uncertainty and inherent variation in the daily order schedule of the downstream aluminum remelters. In this context a fundamental question arises, considering the metallurgical complexities of dross reprocessing, what is the value of operating a coordinated set of by-product reprocessing plants and remelting cast houses? A methodology is presented to calculate the optimal recycling center production parameters including 1) the number of recycled products, 2) the volume of recycled products, 3) allocation of recycled materials across recycled products, 4) allocation of recycled products across finished alloys, 4) the level of flexibility for the recycling center to operate. The methods implemented include, 1) an optimization model to describe the long term operations of the recycling center, 2) an uncertainty simulation tool, 3) a simulation optimization method, 4) a dynamic simulation tool with four embedded daily production optimization models of varying degrees of flexibility. This methodology is used to quantify the performance of several recycling center production designs of varying levels of coordination and flexibility. This analysis allowed the identification of the optimal recycling center production design based on maximizing liquid recycled product incorporation and minimizing cast sows. The long term production optimization model was used to evaluate the theoretical viability of the proposed two stage scrap and aluminum dross reprocessing operation including the impact of reducing coordination on model performance. Reducing the coordination between the recycling center and downstream remelters by reducing the number of recycled products from ten to five resulted in only 1.3% less secondary material incorporated into downstream production. The dynamic simulation tool was used to evaluate the performance of the calculated recycling center production plan when resolved on a daily timeframe for varying levels of operational flexibility. The dynamic simulation revealed the optimal performance corresponded to the fixed recipe with flexible production daily optimization model formulation. Calculating recycled product characteristics using the proposed simulation optimization method increased profitability in cases of uncertain downstream remelter production and expensive aluminum dross and post-consumed secondary materials.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Tracey H. Brommer.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Ph.D.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">219 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by 
copyright. They may be viewed from this source for any purpose, but 
reproduction or distribution in any format is prohibited without written 
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Materials Science and Engineering.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Recycling production designs : the value of coordination and flexibility in aluminum recycling operations</dim:field>
   <dim:field mdschema="dc" element="title" qualifier="alternative" lang="en_US">Value of coordination and flexibility in aluminum recycling operations</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="c8707adc-9954-46fa-b35c-386761d49209">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Recycling production designs : the value of coordination and flexibility in aluminum recycling operations&lt;/Title>
   	&lt;Subtitle>Value of coordination and flexibility in aluminum recycling operations&lt;/Subtitle>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2013&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Brommer, Tracey H. (Tracey Helenius)&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Materials Science and Engineering.&lt;/Keyword>
   	&lt;Abstract>The growing motivation for aluminum recycling has prompted interest in recycling alternative and more challenging secondary materials. The nature of these alternative secondary materials necessitates the development of an intermediate recycling facility that can reprocess the secondary materials into a liquid product. Two downstream aluminum remelters will incorporate the liquid products into their aluminum alloy production schedules. Energy and environmental benefits result from delivering the products as liquid but coordination challenges persist because of the energy cost to maintain the liquid. Further coordination challenges result from the necessity to establish a long term recycling production plan in the presence of long term downstream aluminum remelter production uncertainty and inherent variation in the daily order schedule of the downstream aluminum remelters. In this context a fundamental question arises, considering the metallurgical complexities of dross reprocessing, what is the value of operating a coordinated set of by-product reprocessing plants and remelting cast houses? A methodology is presented to calculate the optimal recycling center production parameters including 1) the number of recycled products, 2) the volume of recycled products, 3) allocation of recycled materials across recycled products, 4) allocation of recycled products across finished alloys, 4) the level of flexibility for the recycling center to operate. The methods implemented include, 1) an optimization model to describe the long term operations of the recycling center, 2) an uncertainty simulation tool, 3) a simulation optimization method, 4) a dynamic simulation tool with four embedded daily production optimization models of varying degrees of flexibility. This methodology is used to quantify the performance of several recycling center production designs of varying levels of coordination and flexibility. This analysis allowed the identification of the optimal recycling center production design based on maximizing liquid recycled product incorporation and minimizing cast sows. The long term production optimization model was used to evaluate the theoretical viability of the proposed two stage scrap and aluminum dross reprocessing operation including the impact of reducing coordination on model performance. Reducing the coordination between the recycling center and downstream remelters by reducing the number of recycled products from ten to five resulted in only 1.3% less secondary material incorporated into downstream production. The dynamic simulation tool was used to evaluate the performance of the calculated recycling center production plan when resolved on a daily timeframe for varying levels of operational flexibility. The dynamic simulation revealed the optimal performance corresponded to the fixed recipe with flexible production daily optimization model formulation. Calculating recycled product characteristics using the proposed simulation optimization method increased profitability in cases of uncertain downstream remelter production and expensive aluminum dross and post-consumed secondary materials.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>