<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-18T22:31:12Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/80996" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/80996</identifier><datestamp>2022-01-27T21:41:23Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Bruce Cameron and Bradley Morrison.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Freeman, Carolyn Marie</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Global Operations Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Engineering Systems Division</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2013-09-24T19:35:52Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2013-09-24T19:35:52Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2013</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2013</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/80996</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">857789064</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Global Operations Program at MIT, 2013.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 55-56).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Sikorsky is currently negotiating the SDTA proposal for the CH-53K helicopter. Due to the Truth In Negotiations Act (TINA), when submitting a proposal to the government all suppliers with a total award greater than $700,000 need to have supporting documentation (material substantiation) showing that pricing is fair and reasonable. This can be accomplished through competition, a cost-price analysis (CPA), or commerciality. Each entity involved in the proposal prefers a different substantiation method: the government prefers CPA or competition, the suppliers prefer commerciality, and Sikorsky prefers competition. Because the government and suppliers have opposing views on commerciality, the government has increased the oversight and complexity of the commercial process. Previously, a proposal's commerciality claims required only a commerciality claim form and an invoice showing that the part had been sold to a commercial entity, but did not require the supplier to provide the commercial invoice price. For the SDTA proposal, an approved commerciality claim required a commerciality form, non-redacted invoices showing pricing information and the customer to which the part was sold, an escalated price analysis to support price reasonableness, a detailed list of modifications to the commercial part, an estimated cost of the modifications, and final commercial end user information. The commercial process involved roughly 90 Sikorsky employees and required roughly 11 months to fulfill all of the government's SDTA commercial requirements. As a comparison, CPA substantiation was completed 4 months prior to commerciality. Reasons for the long cycle time include labor time, a lengthy paper internal approval process including process downtime, lost or misprocessed documents, and insufficient employee training. To combat these inefficiencies, a formalized commercial substantiation process that uses an electronic workspace to provide process control is proposed in this thesis. The formalized commercial substantiation process decreases the required labor hours by an estimated 43%, decreases the internal approval cycle time by 74%, and provides secure document management. These improvements not only benefit the company internally, but also provide external benefits like an increase in government satisfaction which will help Sikorsky attain additional government contracts.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Carolyn Marie Freeman.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">67 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by &#xd;
copyright. They may be viewed from this source for any purpose, but &#xd;
reproduction or distribution in any format is prohibited without written &#xd;
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Engineering Systems Division.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Process improvement and analytics of commercial material substantiation</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="60d69f2d-6951-4571-9311-3cfa0ddc07fa">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Process improvement and analytics of commercial material substantiation&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2013&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Freeman, Carolyn Marie&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Engineering Systems Division.&lt;/Keyword>
    &lt;Keyword>Leaders for Global Operations Program.&lt;/Keyword>
   	&lt;Abstract>Sikorsky is currently negotiating the SDTA proposal for the CH-53K helicopter. Due to the Truth In Negotiations Act (TINA), when submitting a proposal to the government all suppliers with a total award greater than $700,000 need to have supporting documentation (material substantiation) showing that pricing is fair and reasonable. This can be accomplished through competition, a cost-price analysis (CPA), or commerciality. Each entity involved in the proposal prefers a different substantiation method: the government prefers CPA or competition, the suppliers prefer commerciality, and Sikorsky prefers competition. Because the government and suppliers have opposing views on commerciality, the government has increased the oversight and complexity of the commercial process. Previously, a proposal&amp;apos;s commerciality claims required only a commerciality claim form and an invoice showing that the part had been sold to a commercial entity, but did not require the supplier to provide the commercial invoice price. For the SDTA proposal, an approved commerciality claim required a commerciality form, non-redacted invoices showing pricing information and the customer to which the part was sold, an escalated price analysis to support price reasonableness, a detailed list of modifications to the commercial part, an estimated cost of the modifications, and final commercial end user information. The commercial process involved roughly 90 Sikorsky employees and required roughly 11 months to fulfill all of the government&amp;apos;s SDTA commercial requirements. As a comparison, CPA substantiation was completed 4 months prior to commerciality. Reasons for the long cycle time include labor time, a lengthy paper internal approval process including process downtime, lost or misprocessed documents, and insufficient employee training. To combat these inefficiencies, a formalized commercial substantiation process that uses an electronic workspace to provide process control is proposed in this thesis. The formalized commercial substantiation process decreases the required labor hours by an estimated 43%, decreases the internal approval cycle time by 74%, and provides secure document management. These improvements not only benefit the company internally, but also provide external benefits like an increase in government satisfaction which will help Sikorsky attain additional government contracts.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>