<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T23:14:59Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/81615" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/81615</identifier><datestamp>2026-06-06T01:05:15Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Olivier L. de Weck and Mark W. Thomas.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Nawara, Terrence M. (Terrence Michael)</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Department of Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2013-10-24T17:35:21Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2013-10-24T17:35:21Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2013</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/81615</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">858873077</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (S.M. in Naval Architecture and Marine Engineering)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (S.M. in Engineering and Management)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2013.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">"June 2013." Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 71-74).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Submarine repair schedules are some of the most complex schedules seen in project management. Repairs of a nuclear U.S. submarine are resource constrained since resources are divided among approximately thirty shops (e.g. electricians, welders, and pipefitters). The system complexity, the tight spaces, the operational nuclear reactor, the challenges inherent in repair, and resource competition all contribute to a dense integrated schedule. Minimizing the overall length of each project, the "makespan," is the primary objective function of this thesis. This thesis uses a commercially available simulation package, @Risk, to analyze a realistic submarine repair schedule. Simulation is used to analyze uncertainty in the task durations and identify crucial tasks that highly impact the makespan. Finally, a genetic algorithm is tested to assign resources to minimize the makespan. The submarine repair data was based on a schedule with 4038 tasks and 7723 constraints or ties. A simulation assigned all 4038 tasks a triangle probability distribution with the duration set at plus or minus 10 percent of the original duration estimate. Sensitivity analysis of the simulation identified key task nodes having significant impact on the overall duration. These top ten crucial tasks were then given similar probability distributions and another simulation was run keeping the remaining 4028 tasks as deterministic durations. Minimizing the makespan could only be executed on a small subset of data, 25 tasks, due to limiting assumptions on reducing task durations by assigning more resources. An overall improvement of 5.5-15.6 % was achieved; this gives an indication of the approximate makespan optimization potential in current U.S. submarine repair, maintenance and overhaul operations.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Terrence M. Nawara.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M. in Engineering and Management</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M. in Naval Architecture and Marine Engineering</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">74 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by 
copyright. They may be viewed from this source for any purpose, but 
reproduction or distribution in any format is prohibited without written 
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Resource constrained scheduling problem at U.S. Naval Shipyards</dim:field>
   <dim:field mdschema="dc" element="title" qualifier="alternative" lang="en_US">Resource constrained scheduling problem at United States Naval Shipyards</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="401a0b72-8269-4d47-8807-682afc10858a">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Resource constrained scheduling problem at U.S. Naval Shipyards&lt;/Title>
   	&lt;Subtitle>Resource constrained scheduling problem at United States Naval Shipyards&lt;/Subtitle>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2013&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Nawara, Terrence M. (Terrence Michael)&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
   	&lt;Abstract>Submarine repair schedules are some of the most complex schedules seen in project management. Repairs of a nuclear U.S. submarine are resource constrained since resources are divided among approximately thirty shops (e.g. electricians, welders, and pipefitters). The system complexity, the tight spaces, the operational nuclear reactor, the challenges inherent in repair, and resource competition all contribute to a dense integrated schedule. Minimizing the overall length of each project, the &amp;quot;makespan,&amp;quot; is the primary objective function of this thesis. This thesis uses a commercially available simulation package, @Risk, to analyze a realistic submarine repair schedule. Simulation is used to analyze uncertainty in the task durations and identify crucial tasks that highly impact the makespan. Finally, a genetic algorithm is tested to assign resources to minimize the makespan. The submarine repair data was based on a schedule with 4038 tasks and 7723 constraints or ties. A simulation assigned all 4038 tasks a triangle probability distribution with the duration set at plus or minus 10 percent of the original duration estimate. Sensitivity analysis of the simulation identified key task nodes having significant impact on the overall duration. These top ten crucial tasks were then given similar probability distributions and another simulation was run keeping the remaining 4028 tasks as deterministic durations. Minimizing the makespan could only be executed on a small subset of data, 25 tasks, due to limiting assumptions on reducing task durations by assigning more resources. An overall improvement of 5.5-15.6 % was achieved; this gives an indication of the approximate makespan optimization potential in current U.S. submarine repair, maintenance and overhaul operations.&lt;/Abstract>