<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T10:58:10Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/84185" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/84185</identifier><datestamp>2022-01-13T07:54:48Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Mark Abramson and Hamsa Balakrishnan.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Robinson, Eric John, S.M. Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Operations Research Center.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Operations Research Center</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Program in Media Arts and Sciences (Massachusetts Institute of Technology)</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2014-01-23T17:12:46Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2014-01-23T17:12:46Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2013</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/84185</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">867864699</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (S.M.)--Massachusetts Institute of Technology, Sloan School of Management, Operations Research Center, 2013.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">This electronic version was submitted by the student author.  The certified thesis is available in the Institute Archives and Special Collections.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">"June 2013." Cataloged from student-submitted PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 155-157).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">collect information. This may include taking pictures of the ground, gathering infrared photos, taking atmospheric pressure measurements, or any conceivable form of data collection. Often these separate organizations have overlapping collection interests or flight plans that are sending sensors into similar regions. However, they tend to be controlled by separate planning systems which operate on asynchronous scheduling cycles. We present a method for coordinating various collection tasks between the planning systems in order to vastly increase the utility that can be gained from these assets. This method focuses on allocation of collection requests to scheduling systems rather than complete centralized planning over the entire system so that the current planning infrastructure can be maintained without changing any aspects of the schedulers. We expand on previous work in this area by inclusion of a learning method to capture information about the uncertainty pertaining to the completion of collection tasks, and subsequently utilize this information in a mathematical programming method for resource allocation. An analysis of results and improvements as compared to current operations is presented at the end.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Eric John Robinson.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">157 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by 
copyright. They may be viewed from this source for any purpose, but 
reproduction or distribution in any format is prohibited without written 
permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Operations Research Center.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Coordinated planning of air and space assets : an optimization and learning based approach</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="d6becd39-2c48-4d75-b08d-aa72aae64196">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Coordinated planning of air and space assets : an optimization and learning based approach&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2013&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Robinson, Eric John, S.M. Massachusetts Institute of Technology&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Operations Research Center.&lt;/Keyword>
   	&lt;Abstract>collect information. This may include taking pictures of the ground, gathering infrared photos, taking atmospheric pressure measurements, or any conceivable form of data collection. Often these separate organizations have overlapping collection interests or flight plans that are sending sensors into similar regions. However, they tend to be controlled by separate planning systems which operate on asynchronous scheduling cycles. We present a method for coordinating various collection tasks between the planning systems in order to vastly increase the utility that can be gained from these assets. This method focuses on allocation of collection requests to scheduling systems rather than complete centralized planning over the entire system so that the current planning infrastructure can be maintained without changing any aspects of the schedulers. We expand on previous work in this area by inclusion of a learning method to capture information about the uncertainty pertaining to the completion of collection tasks, and subsequently utilize this information in a mathematical programming method for resource allocation. An analysis of results and improvements as compared to current operations is presented at the end.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>