<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-19T22:14:12Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/89965" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/89965</identifier><datestamp>2022-01-13T07:55:22Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131024</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Joel P. Clark.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Dunn, William Colby</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Massachusetts Institute of Technology. Department of Materials Science and Engineering.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Materials Science and Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2014-09-19T21:31:34Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2014-09-19T21:31:34Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2013</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2014</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/89965</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">890129375</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: S.B., Massachusetts Institute of Technology, Department of Materials Science and Engineering, June 2014.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis. "May 2013."</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (pages 43-45).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Life Cycle Cost Analysis (LCCA) is a commonly used tool in analyzing the economic viability of highway construction investments. The initial and life-cycle materials costs associated with highway construction involve a high level of uncertainty and therefore warrant extensive and dynamic cost analysis. These uncertainties derive from extensive materials usage costs. Despite the advantages of implementing a probabilistic approach to cost analysis, many state departments of transportation (DOTs) continue to employ a deterministic model, thereby misjudging, and often altogether neglecting the underlying uncertainty and risks. The goals of this paper are twofold: first, to validate forecasting as a viable method to predict future materials' prices, and second, to explore economies of scale as a potential driver of uncertainty. The paper will then apply these results to a case study methodology, looking at a comparative LCCA of two materials alternative, asphalt vs. concrete pavement designs for two states: Florida and Colorado. Endeavoring in this light, the author has characterized uncertainty in a way that will be comprehensible by practitioners. This research has successfully validated out-of-sample forecasting as a superior method of forecasting materials prices, characterized uncertainty related to project quantity, and delivered results using a relatable case study approach.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by William Colby Dunn.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.B.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">50 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Materials Science and Engineering.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">A more comprehensive life cycle cost analysis of pavement materials alternatives</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="1e59e263-d061-4df2-8dfe-295688bf05d1">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>A more comprehensive life cycle cost analysis of pavement materials alternatives&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2014&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Dunn, William Colby&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Materials Science and Engineering.&lt;/Keyword>
   	&lt;Abstract>Life Cycle Cost Analysis (LCCA) is a commonly used tool in analyzing the economic viability of highway construction investments. The initial and life-cycle materials costs associated with highway construction involve a high level of uncertainty and therefore warrant extensive and dynamic cost analysis. These uncertainties derive from extensive materials usage costs. Despite the advantages of implementing a probabilistic approach to cost analysis, many state departments of transportation (DOTs) continue to employ a deterministic model, thereby misjudging, and often altogether neglecting the underlying uncertainty and risks. The goals of this paper are twofold: first, to validate forecasting as a viable method to predict future materials&amp;apos; prices, and second, to explore economies of scale as a potential driver of uncertainty. The paper will then apply these results to a case study methodology, looking at a comparative LCCA of two materials alternative, asphalt vs. concrete pavement designs for two states: Florida and Colorado. Endeavoring in this light, the author has characterized uncertainty in a way that will be comprehensible by practitioners. This research has successfully validated out-of-sample forecasting as a superior method of forecasting materials prices, characterized uncertainty related to project quantity, and delivered results using a relatable case study approach.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>