<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-20T07:19:38Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/90758" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/90758</identifier><datestamp>2022-01-27T21:12:38Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Bruce Cameron and Georgia Perakis.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Genser, Bradley Philip</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="other" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Leaders for Global Operations Program at MIT</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2014-10-08T15:27:19Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2014-10-08T15:27:19Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2014</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">2014</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/90758</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">891371260</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2014. In conjunction with the Leaders for Global Operations Program at MIT.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2014. In conjunction with the Leaders for Global Operations Program at MIT.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">10</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Cataloged from PDF version of thesis.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (page 111).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">We propose a novel method to quantify the cost of activities involved in the picking portion of order fulfillment. We adapt the general method of picking cost quantification to the specific situation of TP&amp;G, a publicly held utility, to build a simulation model which calculates total cost (procurement purchasing costs + material handling costs) across TP&amp;G's Construction Materials Supply Chain (CMSC) . We use the simulation model to demonstrate the effect of case pack quantities and various disputed (within TP&amp;G) material handling policies on supply chain costs. Finally. we move beyond the descriptive results of the simulation model and build optimization models for a case where a single case pack quantity is held in inventory, under conditions of both deterministic and stochastic demand. We show that case pack quantity held in inventory greatly impacts supply chain costs. We also find the novel result that the optimal material picking policy for both deterministic and stochastic demand is a threshold policy whereby orders should be fulfilled with whole case packs up to the highest possible multiple of case pack quantity that does not exceed an ordered quantity. If the remainder of an order to be fulfilled exceeds a certain number of units in a case pack, that remainder should be fulfilled with a whole case pack (overfilled). This threshold can be efficiently calculated for all case pack quantities (optimal or not).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Bradley Philip Genser.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">M.B.A.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">111 pages</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri" lang="en_US">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering.</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Leaders for Global Operations Program.</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Optimizing procurement and handling costs in a utility</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="3ecbea73-2f65-4ae3-b717-8e5153675ca8">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Optimizing procurement and handling costs in a utility&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2014&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Genser, Bradley Philip&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management.&lt;/Keyword>
    &lt;Keyword>Mechanical Engineering.&lt;/Keyword>
    &lt;Keyword>Leaders for Global Operations Program.&lt;/Keyword>
   	&lt;Abstract>We propose a novel method to quantify the cost of activities involved in the picking portion of order fulfillment. We adapt the general method of picking cost quantification to the specific situation of TP&amp;amp;G, a publicly held utility, to build a simulation model which calculates total cost (procurement purchasing costs + material handling costs) across TP&amp;amp;G&amp;apos;s Construction Materials Supply Chain (CMSC) . We use the simulation model to demonstrate the effect of case pack quantities and various disputed (within TP&amp;amp;G) material handling policies on supply chain costs. Finally. we move beyond the descriptive results of the simulation model and build optimization models for a case where a single case pack quantity is held in inventory, under conditions of both deterministic and stochastic demand. We show that case pack quantity held in inventory greatly impacts supply chain costs. We also find the novel result that the optimal material picking policy for both deterministic and stochastic demand is a threshold policy whereby orders should be fulfilled with whole case packs up to the highest possible multiple of case pack quantity that does not exceed an ordered quantity. If the remainder of an order to be fulfilled exceeds a certain number of units in a case pack, that remainder should be fulfilled with a whole case pack (overfilled). This threshold can be efficiently calculated for all case pack quantities (optimal or not).&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>