<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-23T05:58:21Z</responseDate><request verb="GetRecord" identifier="oai:dspace.mit.edu:1721.1/9777" metadataPrefix="dim">https://dspace.mit.edu/server/oai/request</request><GetRecord><record><header><identifier>oai:dspace.mit.edu:1721.1/9777</identifier><datestamp>2021-07-05T14:03:20Z</datestamp><setSpec>com_1721.1_7582</setSpec><setSpec>com_1721.1_7581</setSpec><setSpec>col_1721.1_131023</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor" lang="en_US">Stephen C. Graves and Thomas W. Eagar.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Kimber, Michael A. (Michael Allan), 1971-</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Massachusetts Institute of Technology. Department of Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="department" lang="en_US">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2005-08-19T20:06:21Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2005-08-19T20:06:21Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">1999</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en_US">1999</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/1721.1/9777</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="oclc" lang="en_US">42827872</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Thesis (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1999.</dim:field>
   <dim:field mdschema="dc" element="description" lang="en_US">Includes bibliographical references (p. 71).</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Companies today often look to improved inventory management as a means to lower costs and increase their ability to consistently meet customer needs. Research was conducted at Alcoa  (Shanghai) Aluminum Products Co,, Ltd, (ASAP) in Shanghai, China to determine a framework that might be used to define and implement a visual inventory management system in a foil mill. The framework proposed is founded on I) understanding the current material and information flows and developing reasons why inventory exists, 2) consolidating rolling and annealing schedules, identifying key specifications, determining necessary inventory levels, and defining a pull system, and 3) creating an environment where people are included in the change process and educated in the principles upon which the visual inventory management system is based.  The framework proposed enabled a pull production system to be implemented at ASAP in the cast shop and rolling area in approximately 6 months. It is anticipated that total WIP and finished goods inventory levels will be decreased from 2000T to 1600T, average coil manufacturing time will be reduced from approximately 19 days to I S,S days, and delivery performance will be improved.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="statementofresponsibility" lang="en_US">by Michael A. Kimber.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">S.M.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">71 p.</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">6573394 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">6573154 bytes</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">eng</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en_US">Massachusetts Institute of Technology</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.</dim:field>
   <dim:field mdschema="dc" element="rights" qualifier="uri">http://dspace.mit.edu/handle/1721.1/7582</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Sloan School of Management</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">Mechanical Engineering</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Definition and implementation of a visual inventory management system</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="authorsordered">false</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="others" element="access-status">unknown</dim:field>
   <dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="5846c4a4-3940-429b-bad5-c29be5e6e4db">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>eng&lt;/Language>
   	&lt;Title>Definition and implementation of a visual inventory management system&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>1999&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Kimber, Michael A. (Michael Allan), 1971-&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Massachusetts Institute of Technology&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;License>http://dspace.mit.edu/handle/1721.1/7582&lt;/License>
    &lt;Keyword>Sloan School of Management&lt;/Keyword>
    &lt;Keyword>Mechanical Engineering&lt;/Keyword>
   	&lt;Abstract>Companies today often look to improved inventory management as a means to lower costs and increase their ability to consistently meet customer needs. Research was conducted at Alcoa  (Shanghai) Aluminum Products Co,, Ltd, (ASAP) in Shanghai, China to determine a framework that might be used to define and implement a visual inventory management system in a foil mill. The framework proposed is founded on I) understanding the current material and information flows and developing reasons why inventory exists, 2) consolidating rolling and annealing schedules, identifying key specifications, determining necessary inventory levels, and defining a pull system, and 3) creating an environment where people are included in the change process and educated in the principles upon which the visual inventory management system is based.  The framework proposed enabled a pull production system to be implemented at ASAP in the cast shop and rolling area in approximately 6 months. It is anticipated that total WIP and finished goods inventory levels will be decreased from 2000T to 1600T, average coil manufacturing time will be reduced from approximately 19 days to I S,S days, and delivery performance will be improved.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>