MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Operational improvement at a mass customization semiconductor equipment manufacturing facility through inventory consolidation

Author(s)
Zhang, Yuwen, M. Eng. Massachusetts Institute of Technology
Thumbnail
DownloadFull printable version (1.271Mb)
Other Contributors
Massachusetts Institute of Technology. Department of Mechanical Engineering.
Advisor
Stanley B. Gershwin.
Terms of use
MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
This thesis addresses the operational improvement at Varian Semiconductor Equipment and Associates (Varian), a subsidiary of Applied Materials (AMAT), through material shortage reduction. Varian manufactures highly customized implantation equipment. Sub-assemblies that form an implantation tool are manufactured in the supermarket at Varian. The company is currently trying to increase the on-time delivery of sub-assemblies from the supermarket. Around 40% of sub-assemblies are delivered late to the tool production flow line or to the AMAT global parts banks and customers. This project focused on the improvement of supermarket on-time delivery. Impact analysis was conducted to assess the significance of the late delivery to the overall operation at Varian. Root causes of late delivery were identified through extensive data collection and three proposals were created: re-evaluation of inventory bin sizes, consolidation of inventory storage and assignment of priority based on real-time capacity. The second approach was further divided into two directions. This thesis emphasizes on one of the two directions, addressing the storage space required in the warehouse for inventory consolidation and the new material picking process. Various issues associated with the implementation were considered and solutions were proposed. Material shortages can be reduced by 64%, while pick-to-short kits are reduced by 50%. Supplier on-time delivery issues and purchase order placement should be investigated to further decrease material shortages.
Description
Thesis: M. Eng. in Advanced Manufacturing and Design, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2017.
 
This electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.
 
Cataloged from student-submitted PDF version of thesis.
 
Includes bibliographical references (page 77).
 
Date issued
2017
URI
http://hdl.handle.net/1721.1/113730
Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Publisher
Massachusetts Institute of Technology
Keywords
Mechanical Engineering.

Collections
  • Graduate Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.