Search
Now showing items 1-10 of 10
Requirements specification and verification of production tooling
(Massachusetts Institute of Technology, 1995)
Using QFC to fine-tune the process of transferring new products from cross-functional development of teams to manufacturing
(Massachusetts Institute of Technology, 1995)
A business planning model to access the tradeoff between inventory and capacity for a Stage 1 manufacturing process
(Massachusetts Institute of Technology, 1995)
A systems engineering approach to the concept development process
(Massachusetts Institute of Technology, 1995)
Implementing cycle time reduction in product development
(Massachusetts Institute of Technology, 1995)
A manufacturing cell design tool for the development and evaluation of transfer lines
(Massachusetts Institute of Technology, 1995)
Selection of operations management methodologies in disparate cost environments
(Massachusetts Institute of Technology, 1995)
The evolution and implementation of electronic prototyping systems
(Massachusetts Institute of Technology, 1995)
Development and implementation of a volume-based scheduling system for highly repetitive production
(Massachusetts Institute of Technology, 1995)
Printed circuit assembly prototyping : an analysis of customer requirements and improving initiatives within Hewlett-Packard's Loveland Circuit Assembly Center
(Massachusetts Institute of Technology, 1995)