Show simple item record

dc.contributor.advisorMichael W. Golay.en_US
dc.contributor.authorLin, Junne Lungen_US
dc.date.accessioned2006-07-31T15:08:48Z
dc.date.available2006-07-31T15:08:48Z
dc.date.copyright1994en_US
dc.date.issued1994en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/33515
dc.descriptionThesis (M.S.)--Massachusetts Institute of Technology, Dept. of Nuclear Engineering, 1994.en_US
dc.descriptionIncludes bibliographical references (leaves 79-82).en_US
dc.description.statementofresponsibilityby Junne Lung Lin.en_US
dc.format.extent82 leavesen_US
dc.format.extent4688086 bytes
dc.format.extent4691800 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectNuclear Engineeringen_US
dc.titleUse of combined signals for reactor shutdown signal validationen_US
dc.typeThesisen_US
dc.description.degreeM.S.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Nuclear Engineeringen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Nuclear Science and Engineering
dc.identifier.oclc31763307en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record