Show simple item record

dc.contributor.advisorRoy E. Welsch and Thomas W. Eagar.en_US
dc.contributor.authorGonzález, Carlos A. (Carlos Alberto), 1972-en_US
dc.contributor.otherLeaders for Manufacturing Program.en_US
dc.date.accessioned2006-11-08T16:34:28Z
dc.date.available2006-11-08T16:34:28Z
dc.date.copyright2004en_US
dc.date.issued2004en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/34766
dc.descriptionThesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2004.en_US
dc.descriptionIncludes bibliographical references (p. 49).en_US
dc.description.abstractFor this study, a novel wire inspection system was developed to detect surface defects and monitor diameter real-time during the final wire drawing operation. Throughout his work, it was proven that the new inspection system was able to catch common wire defects under manufacturing conditions (wire speed). Furthermore, defect density limits were defined based on data collected during this study. A production version of the wire inspection system was jointly developed with the equipment supplier and an order was placed for three complete systems to be installed in all final draw machines. Increased competition and poor economic conditions forced the manufacturer to place an unprecedented focus on decreasing manufacturing costs. The wire inspection system reported in this thesis was developed with the objective of increasing productivity at the most critical operation in the factory; final wire drawing.en_US
dc.description.statementofresponsibilityby Carlos A. González.en_US
dc.format.extent53 p.en_US
dc.format.extent2915762 bytes
dc.format.extent2915568 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectSloan School of Management.en_US
dc.subjectMechanical Engineering.en_US
dc.subjectLeaders for Manufacturing Program.en_US
dc.titleAddressing equipment set-up time and manufacturing cost through real time inline inspection in tantalum wire manufacturingen_US
dc.typeThesisen_US
dc.description.degreeS.M.en_US
dc.description.degreeM.B.A.en_US
dc.contributor.departmentLeaders for Manufacturing Program at MITen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.contributor.departmentSloan School of Management
dc.identifier.oclc56714603en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record