Show simple item record

dc.contributor.advisorDeborah J. Nightingale and Daniel Whitney.en_US
dc.contributor.authorFrenkel, Yuliya M., 1977-en_US
dc.contributor.otherLeaders for Manufacturing Program.en_US
dc.date.accessioned2006-11-08T16:38:42Z
dc.date.available2006-11-08T16:38:42Z
dc.date.copyright2004en_US
dc.date.issued2004en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/34790
dc.descriptionThesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2004.en_US
dc.descriptionIncludes bibliographical references (p. 95-96).en_US
dc.description.abstractNorthrop Grumman Newport News is committed to implementing lean on the enterprise level. This thesis is focused around work toward creating a global, high-level information and material value stream map for a specified pipe assembly. It identifies the largest areas of waste in the value stream and their root causes. The recommendations assist with the reduction and elimination of the major time delays, inventory buildups, re-work, excessive processes and other waste in the system. The pipe assembly chosen as the basis for the enterprise value stream map is part of a system, newly developed for the current aircraft carrier. The pipe assembly is representative of other pipe assemblies fabricated in the shipyard, so challenges experienced with the manufacturing and flow of the selected assembly are likely to be seen in many other pipe assemblies in the facility. A large number of assemblies was examined to determine the root causes of delivery problems. The analysis was based on the criticality of the ship need date. The root causes for the late assembly delivery were found to be inadequate material inventory levels in the warehouses, lack of fabrication timeline coordination between fabrication shops, late engineering drawing revisions, underestimated fabrication durations, late supplier delivery, late material purchase order placement, and lost material. Suggestions are provided to improve operational efficiencies by targeting the elimination of these root causes that result in the delay of assembly fabrication. Some include material ordering process reorganization, shop loading variability elimination, fabrication timeline alignment, metric realignment, and rework system prioritization. Recommendations for future work focus areen_US
dc.description.abstract(cont.) concentrated on the control of the stock material inventory levels, alignment of the incentives across the enterprise, and reorganization of the planning processes.en_US
dc.description.statementofresponsibilityby Yuliya M. Frenkel.en_US
dc.format.extent103 p.en_US
dc.format.extent6065686 bytes
dc.format.extent6077652 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectSloan School of Management.en_US
dc.subjectMechanical Engineering.en_US
dc.subjectLeaders for Manufacturing Program.en_US
dc.titleEnterprise level value stream mapping and analysis for aircraft carrier componentsen_US
dc.typeThesisen_US
dc.description.degreeS.M.en_US
dc.description.degreeM.B.A.en_US
dc.contributor.departmentLeaders for Manufacturing Program at MITen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.contributor.departmentSloan School of Management
dc.identifier.oclc56793146en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record