Show simple item record

dc.contributor.advisorDavid E. Hardt.en_US
dc.contributor.authorGong, Ming, M. Eng. Massachusetts Institute of Technologyen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Mechanical Engineering.en_US
dc.date.accessioned2012-02-29T18:20:57Z
dc.date.available2012-02-29T18:20:57Z
dc.date.copyright2011en_US
dc.date.issued2011en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/69488
dc.descriptionThesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2011.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (p. 76-77).en_US
dc.description.abstractThe MIT MEng team of four worked with Konarka Technologies, a world leading organic solar panel manufacturer, on production tracking and analysis as well as various operational improvement projects. MIT's collaborative improvement projects at Konarka's manufacturing facility were focused on information system and operations in the finishing processes after solar panels have been coated. This thesis report, however, focuses primarily on information tracking and sharing in Konarka's manufacturing facility, specifically including the barcode tracking system for production tracking, operator interfaces for the system, production tracking (Kanban card) board, and Kaizen continuous improvement board. A barcode tracking system for solar panel and associated user interfaces portion was developed to increase process and inventory accountability. However, because of the intricate SQL database, it may still be difficult for any operator to access this information in the recent future. Hence, physical representative information boards were developed to alleviate this communication complexity. One Kanban (card style) board was implemented to keep track of production information, and another Kaizen (continuous improvement) board was established to keep track of all the continuous activities on the shop floor. Based on various reviews and discussions, these improvement projects served as useful tools for the company's production ramp-up development. Keywords: barcode, tracking system, production tracking, lean, Kanban, Kanban board, Kaizen, Kaizen board, information board, card, card board.en_US
dc.description.statementofresponsibilityby Ming Gong.en_US
dc.format.extent81 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleInformation tracking and sharing in organic photovoltaic panel manufacturingen_US
dc.typeThesisen_US
dc.description.degreeM.Eng.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc775601626en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record