Show simple item record

dc.contributor.advisorMichael W. Golay.en_US
dc.contributor.authorMinelli, Paolo,Ph. D.Massachusetts Institute of Technology.en_US
dc.contributor.otherMassachusetts Institute of Technology. Department of Nuclear Science and Engineering.en_US
dc.date.accessioned2021-02-19T20:57:28Z
dc.date.available2021-02-19T20:57:28Z
dc.date.copyright2020en_US
dc.date.issued2020en_US
dc.identifier.urihttps://hdl.handle.net/1721.1/129920
dc.descriptionThesis: Ph. D., Massachusetts Institute of Technology, Department of Nuclear Science and Engineering, February, 2020en_US
dc.descriptionCataloged from student-submitted PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (pages 192-202).en_US
dc.description.abstractNuclear power is in danger of fading away as a signicant source of energy supply in some parts of the world unless it becomes more competitive. The cost of nuclear energy largely depends on capital cost because nuclear power plants are very expensive to design and build and relatively cheap to operate. The capital cost of nuclear power plants is literally dominated by factors other than those of physical equipment, such as project preparation, site preparation, engineering, planning, installation, and management. Interestingly, project planning, monitoring, execution and management is where too often the nuclear industry has failed in the past. As of 2014, the average time and cost overrun for nuclear projects worldwide are 64% and 117.3%, respectively. There is evidence showing that there is something that we fundamentally do not understand (or represent) in project planning and management. This work is based on the premise that nuclear projects are megaprojects.en_US
dc.description.abstractAs such, they are complex systems that are (1) constantly changing, (2) tightly coupled, (3) governed by feedback, (4) non-linear, (5) history-dependent, (6) self-organizing, (7) adaptive, (8) characterized by tradeoffs, (9) counter intuitive, (10) policy resistant. Hence, traditional project management methods alone are insufficient. An alternative approach to reduce cost and uncertainties of nuclear projects is to turn them into more standard projects, in terms of scope, complexity and capital at risk. For example, the nuclear industry is pursuing the development of micro-reactors, a type of plug- and-play nuclear batteries that would be two orders of magnitude smaller in physical size, wholly manufactured and fueled in a factory, and transported to the site within standard-size freight containers, requiring minimal site excavation and preparation.en_US
dc.description.abstractThis work develops an improved framework for managing megaprojects, estimating their value, and making project/design decisions involving numerous stakeholders, multiple competing objectives, and substantial uncertainty. The framework is built on two pillars: a System Dynamics (SD) model and a probabilistic Discounted Cash Flow (DCF) model. The former focuses on design and construction, while the latter focuses on operations. These two models are consistent with each other and they are run sequentially. To demonstrate its feasibility and appreciate its benefits, the SD-DCF approach is applied to a real-world case study, e.g. an ongoing project in North America based on a marine nuclear power plant entirely built in a shipyard and towed to the site upon completion. A multi-objective decision making problem is framed to illustrate the importance of a solid decision management process in megaprojects.en_US
dc.description.abstract270 dierent projects are derived from the combination of six high-level design/project choices: plant's capacity, deployment concept, flexibility, overlap between design and construction, level of efforts spent on FEED, size and availability of management team. The projects are simulated using the SD and DCF models, represented on trade spaces and finally evaluated against success objectives to derive general policy insights. This framework represents a synthesis of management methods that was not practically avail- able before. This work documents the development of the models, it shows why they should be used, it applies them to an actual case study hence providing a real-world application, and it makes the method credible, publicly available and convenient to adopt.en_US
dc.description.statementofresponsibilityby Paolo Minelli.en_US
dc.format.extent212 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsMIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectNuclear Science and Engineering.en_US
dc.titleImproved methods for managing megaprojectsen_US
dc.typeThesisen_US
dc.description.degreePh. D.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Nuclear Science and Engineeringen_US
dc.identifier.oclc1237642204en_US
dc.description.collectionPh.D. Massachusetts Institute of Technology, Department of Nuclear Science and Engineeringen_US
dspace.imported2021-02-19T20:56:58Zen_US
mit.thesis.degreeDoctoralen_US
mit.thesis.departmentNucEngen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record