Show simple item record

dc.contributor.advisorStanley B. Gershwin.en_US
dc.contributor.authorRizvi, Syed Zia Abbasen_US
dc.contributor.otherMassachusetts Institute of Technology. Dept. of Mechanical Engineering.en_US
dc.date.accessioned2010-05-25T21:07:41Z
dc.date.available2010-05-25T21:07:41Z
dc.date.copyright2009en_US
dc.date.issued2009en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/55232
dc.descriptionThesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (p. 101).en_US
dc.description.abstractThe project work presented in this thesis has proposed solutions related to the control of production and work-in-process inventory in a multi-item multi-stage manufacturing system. A suitable base-stock inventory control policy is recommended to ensure that the desired service levels are maintained between production stages and for the final customers. Concept of coupling the production lines though coupling-stock under suitable assumptions is then introduced to reduce the stock levels at certain consecutive production stages. A framework for demand seasonality and characteristic analysis is also established to enable the inventory control policy to respond to seasonal variations. Monte Carlo simulation was performed on a model of chain of production stages controlled under base-stock policy for the verification of results and to study the effects of stock-outs on base-stock levels. The results of simulation study showed that overall system performance is satisfactory and desired service levels were achieved. Simulation work was also carried out to validate the line coupling concept and its performance under certain conditions. A novel Kanban based visual management system design, which is aligned with the requirements of inventory control policy, along with the material transfer batch sizes between production stages is proposed to facilitate the implementation of inventory control policy. Furthermore, capacitated shipment planning approach is proposed and implemented in form of a spreadsheet-based interface to aid planning personnel in shipment planning under the constraints provided by the inventory control policy.en_US
dc.description.statementofresponsibilityby Syed Zia Abbas Rizvi.en_US
dc.format.extent111 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleProduction and inventory control of a multi-item multi-stage manufacturing system : simulation modeling, capacitated shipment planning and Kanban designen_US
dc.typeThesisen_US
dc.description.degreeM.Eng.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc611962891en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record