Show simple item record

dc.contributor.authorBottaro, Drewen_US
dc.contributor.authorCox, Alan J.en_US
dc.contributor.authorWheatley, Nancy J.en_US
dc.date.accessioned2011-01-11T05:21:40Z
dc.date.available2011-01-11T05:21:40Z
dc.date.issued1981en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/60461
dc.description.abstractThe Public Utility Regulatory Policies Act (PURPA) of 1978 requires that electric utilities purchase electricity generated by small power producers (QFs) such as photovoltaic systems at rates that will encourage the development of new energy technologies. The Federal Energy Regulatory Commission's regulations for PURPA require state regulatory authorities to ensure that utilities pay their full "avoided costs" to the QFs for the energy and capacity provided.en_US
dc.description.abstractThis paper examines the various methods the states have devised to implement the federal policy, particularly the methods chosen for setting buy-back rates. The rates ordered by the states were based on the widely accepted method for determining avoided costs, and the states have approached the problem in a number of ways. The paper tries to compare several states' actions with rates estimated using utility expansion and rate-setting models and determines the impact on the potential break-even capital costs of a photovoltaic system using models which calculate photovoltaic worth.en_US
dc.description.abstractThis paper concludes that PURPA has increased the potential for the development of photovoltaics somewhat by guaranteeing the purchase of PY-generated electricity at a minimum price. Much of the benefit comes from guaranteeing utility purchase of photovoltaic power rather than from higher buy-back rates paid by the utility. However, there is little agreement among the states as to the "correct" method for setting avoided-cost buy-back rates. The models and techniques used in this analysis and developed at the M.I.T. Energy Laboratory offer a possible solution for estimating buy-back rates.en_US
dc.format.extent20 pen_US
dc.publisher[Cambridge, Mass.] : Massachusetts Institute of Technology, Energy Laboratory, 1981en_US
dc.relation.ispartofseriesEnergy Laboratory report (Massachusetts Institute of Technology. Energy Laboratory) no. MIT-EL 81-025.en_US
dc.subjectElectric utilitiesen_US
dc.subjectPhotovoltaic power generation.en_US
dc.titleThe economic impact of state ordered avoided cost rates for photovoltaic generated electricityen_US
dc.identifier.oclc09555027en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record